Novarly ParcelRenewable sites

Renewable sitesAvonmouth

Avonmouth

Avonmouth is operational in Bristol, City of with a recorded capacity of 4.2 MW, and has been generating since 2016-06-28.

4.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-06-28
Solar Photovoltaics
Technology
Bristol Energy Co-Op
Bristol, City of
Authority
England

Planning and build timeline

Application submitted2016-03-30
Permission granted2016-04-08
0 months after submission
Operational2016-06-28
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bristol, City of’s record on solar

Bristol, City of has decided 18 solar farms and approved 100%, taking a median of 1.9 months. See every solar farm decision in Bristol, City of

Other built sites within 15 km

SiteMWDistance
Avonmouth Wind Power
Wind Onshore · Operational
8.20.5 km
Bristol STW (Waste AD)
Anaerobic Digestion · Operational
100.8 km
Avonmouth Low Carbon Energy Facility - Phase 2
Advanced Conversion Technologies · Operational
6.50.9 km
Avonmouth
Advanced Conversion Technologies · Operational
6.50.9 km
Accolade Wines
Wind Onshore · Operational
2.51.2 km
Avonmouth Port - extension
Wind Onshore · Operational
91.5 km
Moorhouse Lane
Solar Photovoltaics · Operational
1.81.6 km
Moorhouse Farm, Moorhouse Lane - Solar Park
Solar Photovoltaics · Under Construction
3.811.6 km

How big is Avonmouth?

Avonmouth has a recorded installed capacity of 4.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Avonmouth?

REPD records the operator as Bristol Energy Co-Op. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Avonmouth approved and built?

The application was submitted on 2016-03-30. Permission was granted on 2016-04-08, 0 months later. The site became operational on 2016-06-28, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5864.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council