Avonmouth Port - extension

Avonmouth Port - extension is operational in Bristol, City of with a recorded capacity of 9 MW, and has been generating since 2014-04-01.

9 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-04-01
Wind Onshore
Technology
Bristol Port Company
Bristol, City of
Authority
England

Planning and build timeline

Application submitted2010-05-12
Permission granted2010-10-14
5 months after submission
Operational2014-04-01
42 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bristol, City of’s record on onshore wind

Bristol, City of has decided 6 onshore wind schemes and approved 100%, taking a median of 4.5 months. See every onshore wind scheme decision in Bristol, City of

Other built sites within 15 km

SiteMWDistance
Avonmouth Low Carbon Energy Facility - Phase 2
Advanced Conversion Technologies · Operational
6.50.9 km
Avonmouth
Advanced Conversion Technologies · Operational
6.50.9 km
Avonmouth Port
Wind Onshore · Operational
61.3 km
Avonmouth
Solar Photovoltaics · Operational
4.21.5 km
Accolade Wines
Wind Onshore · Operational
2.51.7 km
Avonmouth Wind Power
Wind Onshore · Operational
8.22 km
Bristol STW (Waste AD)
Anaerobic Digestion · Operational
102.3 km
Moorhouse Lane
Solar Photovoltaics · Operational
1.83.2 km

How big is Avonmouth Port - extension?

Avonmouth Port - extension has a recorded installed capacity of 9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Avonmouth Port - extension?

REPD records the operator as Bristol Port Company. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Avonmouth Port - extension approved and built?

The application was submitted on 2010-05-12. Permission was granted on 2010-10-14, 5 months later. The site became operational on 2014-04-01, 42 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4159.