Renewable sites › Woodside Leisure Centre - Solar PV Panels
Woodside Leisure Centre - Solar PV Panels
Woodside Leisure Centre - Solar PV Panels is operational in Watford with a recorded capacity of 0.29 MW, and has been generating since 2025-03-01.
Planning and build timeline
| Application submitted | 2024-12-05 |
| Permission granted | 2025-01-30 2 months after submission |
| Operational | 2025-03-01 1 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Aylett Nurseries - Solar Panels Solar Photovoltaics · Operational | — | 7 km |
Iron Mountain Site Solar Photovoltaics · Operational | 0.3 | 9.2 km |
Elstree Film And TV Studios, Shenley Road - Solar Panels Solar Photovoltaics · Operational | 3 | 9.5 km |
Mount Vernon Hospital - Solar Panels Solar Photovoltaics · Operational | — | 9.6 km |
Coursers Farm AD Plant (Waste AD) Anaerobic Digestion · Operational | 3 | 10 km |
Blanche Lane, South Mimms - Solar Panels Solar Photovoltaics · Under Construction | 0.61 | 10.6 km |
Tollgate Farm Battery Storage Battery · Under Construction | 49.5 | 11.7 km |
Land At Swanland Road Solar Photovoltaics · Operational | 5 | 11.8 km |
How big is Woodside Leisure Centre - Solar PV Panels?
Woodside Leisure Centre - Solar PV Panels has a recorded installed capacity of 0.29 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Woodside Leisure Centre - Solar PV Panels?
REPD records the operator as Watford Borough Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Woodside Leisure Centre - Solar PV Panels approved and built?
The application was submitted on 2024-12-05. Permission was granted on 2025-01-30, 2 months later. The site became operational on 2025-03-01, 1 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 17782.