Novarly ParcelRenewable sites

Renewable sitesWoodside Leisure Centre - Solar PV Panels

Woodside Leisure Centre - Solar PV Panels

Woodside Leisure Centre - Solar PV Panels is operational in Watford with a recorded capacity of 0.29 MW, and has been generating since 2025-03-01.

0.29 MW
Capacity
as recorded in REPD
Operational
Status
since 2025-03-01
Solar Photovoltaics
Technology
Watford Borough Council
Watford
Authority
England

Planning and build timeline

Application submitted2024-12-05
Permission granted2025-01-30
2 months after submission
Operational2025-03-01
1 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Aylett Nurseries - Solar Panels
Solar Photovoltaics · Operational
7 km
Iron Mountain Site
Solar Photovoltaics · Operational
0.39.2 km
Elstree Film And TV Studios, Shenley Road - Solar Panels
Solar Photovoltaics · Operational
39.5 km
Mount Vernon Hospital - Solar Panels
Solar Photovoltaics · Operational
9.6 km
Coursers Farm AD Plant (Waste AD)
Anaerobic Digestion · Operational
310 km
Blanche Lane, South Mimms - Solar Panels
Solar Photovoltaics · Under Construction
0.6110.6 km
Tollgate Farm Battery Storage
Battery · Under Construction
49.511.7 km
Land At Swanland Road
Solar Photovoltaics · Operational
511.8 km

How big is Woodside Leisure Centre - Solar PV Panels?

Woodside Leisure Centre - Solar PV Panels has a recorded installed capacity of 0.29 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Woodside Leisure Centre - Solar PV Panels?

REPD records the operator as Watford Borough Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Woodside Leisure Centre - Solar PV Panels approved and built?

The application was submitted on 2024-12-05. Permission was granted on 2025-01-30, 2 months later. The site became operational on 2025-03-01, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 17782.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council