Planning and build timeline
| Application submitted | 2024-03-14 |
| Permission granted | 2024-04-26 1 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Manchester’s record on solar
Manchester has decided 45 solar farms and approved 91%, taking a median of 1.7 months. See every solar farm decision in Manchester →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
The National Cycling Centre Velodrome Solar Photovoltaics · Operational | 0.7 | 0.5 km |
The National Cycling Centre - Solar Photovoltaic Panels Solar Photovoltaics · Under Construction | 0.92 | 0.5 km |
Ardwick Railway Goods Yard Incinerator (Newhaven EFW Plant) EfW Incineration · Operational | 33.5 | 1.3 km |
Outer Space Studios Solar Panels Solar Photovoltaics · Operational | 0.6 | 1.4 km |
Central Park - Solar photovaltics Solar Photovoltaics · Operational | 0.15 | 2.4 km |
Tesco Super-Store (Garratt Way, Gorton) Solar Photovoltaics · Operational | 0.7 | 2.5 km |
Reliance Street Mechanical Biological Treatment Facility (MBT) Anaerobic Digestion · Operational | 2 | 2.7 km |
Moston Vale Battery · Under Construction | 10 | 2.8 km |
How big is City Football Academy, Ashton New Road - Solar panels?
City Football Academy, Ashton New Road - Solar panels has a recorded installed capacity of 3.38 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates City Football Academy, Ashton New Road - Solar panels?
REPD records the operator as Manchester City Football Club. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was City Football Academy, Ashton New Road - Solar panels approved and built?
The application was submitted on 2024-03-14. Permission was granted on 2024-04-26, 1 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 16119.