Novarly ParcelRenewable sites

Renewable sitesCity Football Academy, Ashton New Road - Solar panels

City Football Academy, Ashton New Road - Solar panels

City Football Academy, Ashton New Road - Solar panels is a 3.38 MW solar farm under construction in Manchester. Planning permission was granted on 26 April 2024, 1 months after submission. Operator of record: Manchester City Football Club.

3.38 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Manchester City Football Club
Manchester
Authority
England

Planning and build timeline

Application submitted14 March 2024
Permission granted26 April 2024
1 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Manchester approves 91% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with City Football Academy, Ashton New Road - Solar panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Manchester’s record on solar

Manchester has decided 45 solar farms and approved 91%, taking a median of 1.7 months. See every solar farm decision in Manchester

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.70.5 km
Solar Photovoltaics · Under Construction
0.920.5 km
EfW Incineration · Operational
33.51.3 km
Solar Photovoltaics · Operational
0.61.4 km
Solar Photovoltaics · Operational
0.152.4 km
Solar Photovoltaics · Operational
0.72.5 km
Anaerobic Digestion · Operational
22.7 km
Battery · Under Construction
102.8 km

How big is City Football Academy, Ashton New Road - Solar panels?

City Football Academy, Ashton New Road - Solar panels has a recorded installed capacity of 3.38 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates City Football Academy, Ashton New Road - Solar panels?

REPD records the operator as Manchester City Football Club. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was City Football Academy, Ashton New Road - Solar panels approved and built?

The application was submitted on 14 March 2024. Permission was granted on 26 April 2024, 1 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 16119.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode