Renewable sites › Riverside Resource Recovery Facility Battery Storage
Riverside Resource Recovery Facility Battery Storage
Riverside Resource Recovery Facility Battery Storage is under construction in Bexley with a recorded capacity of 2.5 MW.
Planning and build timeline
| Application submitted | 2020-12-09 |
| Permission granted | not recorded |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Crossness Sewage Works Sewage Sludge Digestion · Operational | 5.7 | 1 km |
Crossness Sewage Works Turbine Wind Onshore · Operational | 2.5 | 1 km |
Crossness Sewage Works PV Solar Photovoltaics · Operational | 1.5 | 1.3 km |
Ford Wind Park - Dagenham Wind Onshore · Operational | 5.9 | 1.6 km |
East Dagenham Docks AD (AD) Anaerobic Digestion · Operational | 1.4 | 2.2 km |
Riverside Sewage Treatment Works Digestion Plant Sewage Sludge Digestion · Operational | 4 | 2.5 km |
Dagenham Docks Biogas (Waste AD) Anaerobic Digestion · Operational | 1.4 | 2.5 km |
Ford Motor Company Ltd (Extension) Wind Onshore · Operational | 2 | 2.7 km |
How big is Riverside Resource Recovery Facility Battery Storage?
Riverside Resource Recovery Facility Battery Storage has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Riverside Resource Recovery Facility Battery Storage?
REPD records the operator as Riverside Resource Recovery Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Riverside Resource Recovery Facility Battery Storage approved and built?
The application was submitted on 2020-12-09. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8261.
Novarly Parcel · official public data, read properly · parcel.novarly.com