Renewable planning › Solar › Bexley
Solar planning in Bexley
Bexley has decided 7 solar farms and approved 100% of them, taking a median of 1.8 months to decide. Consented capacity: 3 MW.
⚠️ Small caseload (7 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Bexley compares
Against the 298 UK authorities with 5+ solar decisions, Bexley sits in the 77th percentile for approval rate (7 points above the England average) and the 74th percentile for speed.
Decisions by year
Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (7)
| Scheme | MW | Status | Decided |
|---|---|---|---|
The Mall - Solar Panels New River Retail Limited · 25/02267/PRIORP · 1.8 mo to decide | — | Awaiting Construction | 2026-01-19 |
David Lloyd Leisure, Baugh Road - Solar Panels David Lloyd Leisure plc · 25/01479/PRIOR · 1.7 mo to decide | — | Awaiting Construction | 2025-09-05 |
Thames Innovation Centre, Veridion Way - Solar Panels Thames Innovation Centre · 25/01132/PRIORP · 1.7 mo to decide | 0.17 | Awaiting Construction | 2025-07-21 |
Maidstone Road - Solar Panels JJ Foodservice Limited · 23/02661/PRIORP · 1.8 mo to decide | 0.34 | Awaiting Construction | 2023-12-11 |
Bexleyheath Superbowl, Albion Road - Solar Panels Ivegate Limited · 23/01823/PRIORP · 1.8 mo to decide | 0.19 | Awaiting Construction | 2023-10-24 |
James Watt Way - Solar PV Array WM Morrisons Supermarkets Plc · 21/03425/PRIORP · 1.8 mo to decide | 0.62 | Awaiting Construction | 2022-01-05 |
Crossness Sewage Works PV Thames Water Utilities | 1.5 | Operational | — |
Does Bexley approve solar farms?
Yes — of the 7 solar farms Bexley has decided, 100% were approved (7 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a solar farm application take in Bexley?
The median time from application to decision is 1.8 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much solar capacity has Bexley consented?
3 MW has been consented across 7 approved schemes. There are no applications currently awaiting a decision.
Other technologies in Bexley
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.