Renewable sitesFord Motor Company Ltd (Extension)

Ford Motor Company Ltd (Extension)

Ford Motor Company Ltd (Extension) is an operational 2 MW onshore wind farm in Barking and Dagenham, generating since 12 August 2011. Planning permission was granted on 16 July 2009, 3 months after submission. Operator of record: Unknown.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 12 August 2011
Wind Onshore
Technology
Unknown
Barking and Dagenham
Authority
England

Planning and build timeline

Application submitted2 April 2009
Permission granted16 July 2009
3 months after submission
Operational12 August 2011
25 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Barking and Dagenham: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ford Motor Company Ltd (Extension)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
1.41.1 km
Wind Onshore · Operational
5.91.1 km
Anaerobic Digestion · Operational
1.41.2 km
Solar Photovoltaics · Operational
1.52.5 km
Battery · Under Construction
2.52.7 km
Sewage Sludge Digestion · Operational
42.8 km
Wind Onshore · Operational
2.53 km
Sewage Sludge Digestion · Operational
5.73 km

How big is Ford Motor Company Ltd (Extension)?

Ford Motor Company Ltd (Extension) has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ford Motor Company Ltd (Extension)?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ford Motor Company Ltd (Extension) approved and built?

The application was submitted on 2 April 2009. Permission was granted on 16 July 2009, 3 months later. The site became operational on 12 August 2011, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2683.