Novarly ParcelRenewable sites

Renewable sitesElmsall Way Warehouse

Elmsall Way Warehouse

Elmsall Way Warehouse is operational in Wakefield with a recorded capacity of 2.4 MW, and has been generating since 2021-07-09.

2.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-07-09
Solar Photovoltaics
Technology
Next Distribution
Wakefield
Authority
England

Planning and build timeline

Application submitted2019-12-18
Permission granted2020-05-07
5 months after submission
Operational2021-07-09
14 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wakefield’s record on solar

Wakefield has decided 33 solar farms and approved 94%, taking a median of 1.8 months. See every solar farm decision in Wakefield

Other built sites within 15 km

SiteMWDistance
Elmsall Way, South Elmsall - Solar Panels
Solar Photovoltaics · Under Construction
30.3 km
Skelbrooke Landfill Gas Project
Landfill Gas · Operational
2.12.7 km
Hampole Wind Farm
Wind Onshore · Operational
83 km
South Kirkby Business Park (Waste AD)
Anaerobic Digestion · Operational
64.6 km
Croft Farm, Askern Road - Solar Array & Hydrogen Plant
Solar Photovoltaics · Under Construction
2.56.6 km
Askern Colliery solar farm
Solar Photovoltaics · Operational
57.6 km
Marr Windfarm
Wind Onshore · Operational
87.9 km
Goldthorpe
Solar Photovoltaics · Operational
1.58.6 km

How big is Elmsall Way Warehouse?

Elmsall Way Warehouse has a recorded installed capacity of 2.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Elmsall Way Warehouse?

REPD records the operator as Next Distribution. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Elmsall Way Warehouse approved and built?

The application was submitted on 2019-12-18. Permission was granted on 2020-05-07, 5 months later. The site became operational on 2021-07-09, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7735.