Askern Colliery solar farm
Askern Colliery solar farm is operational in Doncaster with a recorded capacity of 5 MW, and has been generating since 2015-08-14.
Planning and build timeline
| Application submitted | 2014-08-01 |
| Permission granted | 2014-12-08 4 months after submission |
| Operational | 2015-08-14 8 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Doncaster
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Doncaster’s record on solar
Doncaster has decided 27 solar farms and approved 96%, taking a median of 2.3 months. See every solar farm decision in Doncaster →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Croft Farm, Askern Road - Solar Array & Hydrogen Plant Solar Photovoltaics · Under Construction | 2.5 | 4.5 km |
Skelbrooke Landfill Gas Project Landfill Gas · Operational | 2.1 | 5.2 km |
Elmsall Way Warehouse Solar Photovoltaics · Operational | 2.4 | 7.6 km |
Trackwork Limited (EfW) EfW Incineration · Operational | 3 | 7.7 km |
Elmsall Way, South Elmsall - Solar Panels Solar Photovoltaics · Under Construction | 3 | 7.9 km |
Hampole Wind Farm Wind Onshore · Operational | 8 | 8 km |
Celcon Blocks Ltd Wind Onshore · Operational | 2 | 8 km |
Pollington Solar Farm Solar Photovoltaics · Operational | 5 | 8.4 km |
How big is Askern Colliery solar farm?
Askern Colliery solar farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Askern Colliery solar farm?
REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Askern Colliery solar farm approved and built?
The application was submitted on 2014-08-01. Permission was granted on 2014-12-08, 4 months later. The site became operational on 2015-08-14, 8 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2213.
Novarly Parcel · official public data, read properly · parcel.novarly.com