Elmsall Way, South Elmsall - Solar Panels is under construction in Wakefield with a recorded capacity of 3 MW.

3 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Next Holdings
Wakefield
Authority
England

Planning and build timeline

Application submitted2022-05-06
Permission granted2022-09-15
4 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wakefield’s record on solar

Wakefield has decided 33 solar farms and approved 94%, taking a median of 1.8 months. See every solar farm decision in Wakefield

Other built sites within 15 km

SiteMWDistance
Elmsall Way Warehouse
Solar Photovoltaics · Operational
2.40.3 km
Skelbrooke Landfill Gas Project
Landfill Gas · Operational
2.12.9 km
Hampole Wind Farm
Wind Onshore · Operational
83.2 km
South Kirkby Business Park (Waste AD)
Anaerobic Digestion · Operational
64.4 km
Croft Farm, Askern Road - Solar Array & Hydrogen Plant
Solar Photovoltaics · Under Construction
2.56.9 km
Askern Colliery solar farm
Solar Photovoltaics · Operational
57.9 km
Marr Windfarm
Wind Onshore · Operational
88.1 km
Goldthorpe
Solar Photovoltaics · Operational
1.58.6 km

How big is Elmsall Way, South Elmsall - Solar Panels?

Elmsall Way, South Elmsall - Solar Panels has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Elmsall Way, South Elmsall - Solar Panels?

REPD records the operator as Next Holdings. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Elmsall Way, South Elmsall - Solar Panels approved and built?

The application was submitted on 2022-05-06. Permission was granted on 2022-09-15, 4 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11359.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council