Colnbrook Landfill is an operational 1.9 MW landfill gas site in Slough, generating since 1 September 2005. Planning permission was granted on 8 March 2000, 11 months after submission. Operator of record: Biffa.
Planning and build timeline
| Application submitted | 16 April 1999 |
| Permission granted | 8 March 2000 11 months after submission |
| Operational | 1 September 2005 66 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Slough: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Colnbrook Landfill’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
- Green Belt — Slough
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
EfW Incineration · Operational | 30 | 0.3 km |
Solar Photovoltaics · Operational | 4.8 | 4.7 km |
Biomass (dedicated) · Operational | 1.8 | 5.8 km |
Sewage Sludge Digestion · Operational | 1.2 | 7.9 km |
EfW Incineration · Under Construction | 49.9 | 7.9 km |
EfW Incineration · Operational | 50 | 8 km |
Landfill Gas · Operational | 2.7 | 8.2 km |
Battery · Operational | 0.2 | 8.4 km |
How big is Colnbrook Landfill?
Colnbrook Landfill has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Colnbrook Landfill?
REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Colnbrook Landfill approved and built?
The application was submitted on 16 April 1999. Permission was granted on 8 March 2000, 11 months later. The site became operational on 1 September 2005, 66 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 797.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode