Renewable sites › Western International Market (WIM) Site
Western International Market (WIM) Site
Western International Market (WIM) Site is operational in Hounslow with a recorded capacity of 0.2 MW, and has been generating since 2016-05-24.
Planning and build timeline
| Application submitted | 2015-12-14 |
| Permission granted | not recorded |
| Operational | 2016-05-24 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Green Belt — Hounslow
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Western International Market Solar Photovoltaics · Operational | 1.7 | 0 km |
Southall Lane Waste Depot Battery · Operational | — | 0.2 km |
Heathrow Airport Biomass CHP Biomass (dedicated) · Operational | 1.8 | 5.4 km |
Mogden STW Sewage Sludge Digestion · Operational | 5.8 | 5.9 km |
Kneller Hall School Solar Photovoltaics · Under Construction | 0.25 | 6.1 km |
Lakeside EfW EfW Incineration · Operational | 30 | 8.2 km |
Colnbrook Landfill Landfill Gas · Operational | 1.9 | 8.4 km |
Ham Close - 452 Houses, Flats & Leisure Centre Solar Photovoltaics · Under Construction | 0.43 | 9 km |
How big is Western International Market (WIM) Site?
Western International Market (WIM) Site has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Western International Market (WIM) Site?
REPD records the operator as London Borough of Hounslow. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Western International Market (WIM) Site approved and built?
The application was submitted on 2015-12-14. REPD does not record a grant date. The site became operational on 2016-05-24.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6886.