Renewable sitesWestern International Market (WIM) Site

Western International Market (WIM) Site

Western International Market (WIM) Site is an operational 0.2 MW battery storage site in Hounslow, generating since 24 May 2016. REPD does not record the planning grant date. Operator of record: London Borough of Hounslow.

0.2 MW
Capacity
as recorded in REPD
Operational
Status
since 24 May 2016
Battery
Technology
London Borough of Hounslow
Hounslow
Authority
England

Planning and build timeline

Application submitted14 December 2015
Permission grantednot recorded
Operational24 May 2016

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Hounslow: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Western International Market (WIM) Site’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
1.70 km
Battery · Operational
0.2 km
Biomass (dedicated) · Operational
1.85.4 km
Sewage Sludge Digestion · Operational
5.85.9 km
Solar Photovoltaics · Under Construction
0.256.1 km
EfW Incineration · Operational
308.2 km
Landfill Gas · Operational
1.98.4 km
Solar Photovoltaics · Under Construction
0.439 km

How big is Western International Market (WIM) Site?

Western International Market (WIM) Site has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Western International Market (WIM) Site?

REPD records the operator as London Borough of Hounslow. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Western International Market (WIM) Site approved and built?

The application was submitted on 14 December 2015. REPD does not record a grant date. The site became operational on 24 May 2016.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6886.