Renewable sites › Slough Sewage Treatment Works
Slough Sewage Treatment Works
Slough Sewage Treatment Works is an operational 1.2 MW sewage sludge digestion plant in Slough, generating since 17 May 2016. REPD does not record the planning grant date. Operator of record: Thames Water Utilities.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 17 May 2016 |
Screening a site of your own?
Redline runs the record on your own boundary in Slough: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Slough Sewage Treatment Works’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
- Green Belt — Slough
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
EfW Incineration · Under Construction | 49.9 | 2.1 km |
EfW Incineration · Operational | 50 | 2.1 km |
Solar Photovoltaics · Operational | 0.29 | 6.6 km |
Landfill Gas · Operational | 1.9 | 7.9 km |
EfW Incineration · Operational | 30 | 8.1 km |
Solar Photovoltaics · Operational | 4.8 | 9.3 km |
Landfill Gas · Operational | 1 | 9.7 km |
Landfill Gas · Operational | 7.5 | 9.7 km |
How big is Slough Sewage Treatment Works?
Slough Sewage Treatment Works has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Slough Sewage Treatment Works?
REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Slough Sewage Treatment Works approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 17 May 2016.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6508.