Renewable sitesSlough Heat & Power Station

Slough Heat & Power Station

Slough Heat & Power Station is under construction in Slough with a recorded capacity of 49.9 MW.

49.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
EfW Incineration
Technology
Scottish and Southern Energy (SSE)
Slough
Authority
England

Planning and build timeline

Application submitted2014-10-06
Permission granted2017-06-02
32 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Fibrepower, Slough
EfW Incineration · Operational
500.1 km
Slough Sewage Treatment Works
Sewage Sludge Digestion · Operational
1.22.1 km
Iomart, Clivemont Road - Solar Panels
Solar Photovoltaics · Operational
0.296.9 km
Wapsey's Wood III
Landfill Gas · Operational
17.6 km
Wapsey's Wood
Landfill Gas · Operational
7.57.7 km
Wapsey's Wood II Landfill Site
Landfill Gas · Operational
17.7 km
Colnbrook Landfill
Landfill Gas · Operational
1.97.9 km
Springfield Farm
Landfill Gas · Operational
1.48.1 km

How big is Slough Heat & Power Station?

Slough Heat & Power Station has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Slough Heat & Power Station?

REPD records the operator as Scottish and Southern Energy (SSE). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Slough Heat & Power Station approved and built?

The application was submitted on 2014-10-06. Permission was granted on 2017-06-02, 32 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4699.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council