Wraysbury Landfill is operational in Windsor and Maidenhead with a recorded capacity of 4.8 MW, and has been generating since 2017-03-21.
Planning and build timeline
| Application submitted | 2014-07-02 |
| Permission granted | 2014-10-29 4 months after submission |
| Operational | 2017-03-21 29 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
- Green Belt — Windsor and Maidenhead
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Windsor and Maidenhead’s record on solar
Windsor and Maidenhead has decided 11 solar farms and approved 91%, taking a median of 1.8 months. See every solar farm decision in Windsor and Maidenhead →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Norlands Lane Landfill Site Landfill Gas · Operational | 2.7 | 3.8 km |
Norlands Lane Landfill Site (Extension) Landfill Gas · Operational | 4 | 4.5 km |
Lakeside EfW EfW Incineration · Operational | 30 | 4.6 km |
Colnbrook Landfill Landfill Gas · Operational | 1.9 | 4.7 km |
Chertsey Water Treatment Works Solar Photovoltaics · Operational | 1.3 | 5.9 km |
Heathrow Airport Biomass CHP Biomass (dedicated) · Operational | 1.8 | 6 km |
Trumps Farm Landfill Scheme Landfill Gas · Operational | 2.9 | 7.3 km |
Trumps Farm (AD) Anaerobic Digestion · Operational | 2.4 | 7.6 km |
How big is Wraysbury Landfill?
Wraysbury Landfill has a recorded installed capacity of 4.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Wraysbury Landfill?
REPD records the operator as Sirius Solar Building. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Wraysbury Landfill approved and built?
The application was submitted on 2014-07-02. Permission was granted on 2014-10-29, 4 months later. The site became operational on 2017-03-21, 29 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1938.