Novarly ParcelRenewable sites

Renewable sitesChelworth Industrial Estate Solar Park

Chelworth Industrial Estate Solar Park

Chelworth Industrial Estate Solar Park is operational in Wiltshire with a recorded capacity of 1 MW, and has been generating since 2014-02-24.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-02-24
Solar Photovoltaics
Technology
Bath & West Community Energy Ltd
Wiltshire
Authority
England

Planning and build timeline

Application submitted2012-12-05
Permission granted2013-04-22
5 months after submission
Operational2014-02-24
10 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on solar

Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Bentham Farm
Solar Photovoltaics · Operational
82.6 km
Water Eaton Farm / Port Farm
Solar Photovoltaics · Operational
34.85.1 km
Chapel Farm
Solar Photovoltaics · Operational
55.2 km
Braydon Manor Farm
Solar Photovoltaics · Operational
8.75.5 km
Chapel Farm Landfill
Landfill Gas · Operational
35.6 km
Duke Of Gloucester Barracks
Solar Photovoltaics · Operational
1.47.1 km
Castle Eaton Farm
Solar Photovoltaics · Operational
17.87.1 km
Minety South - Battery Storage
Battery · Operational
49.997.5 km

How big is Chelworth Industrial Estate Solar Park?

Chelworth Industrial Estate Solar Park has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chelworth Industrial Estate Solar Park?

REPD records the operator as Bath & West Community Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chelworth Industrial Estate Solar Park approved and built?

The application was submitted on 2012-12-05. Permission was granted on 2013-04-22, 5 months later. The site became operational on 2014-02-24, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1656.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council