Braydon Manor Farm

Braydon Manor Farm is operational in Wiltshire with a recorded capacity of 8.7 MW, and has been generating since 2016-01-15.

8.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-01-15
Solar Photovoltaics
Technology
Public Power Solutions
Wiltshire
Authority
England

Planning and build timeline

Application submitted2013-06-12
Permission granted2013-10-29
5 months after submission
Operational2016-01-15
27 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on solar

Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Bentham Farm
Solar Photovoltaics · Operational
83.2 km
Swindon Energy Plant (Park Grounds)
Advanced Conversion Technologies · Under Construction
63.8 km
Minety South - Battery Storage
Battery · Operational
49.993.9 km
Minety South 2 - Battery Storage Facility
Battery · Operational
49.994.8 km
Stonehill Energy Storage / Lower Minety
Battery · Operational
505.1 km
Stonehill Energy Storage / Upper Minety
Battery · Operational
505.1 km
Stonehill Energy Storage / Upper Minety
Battery · Operational
505.1 km
Chelworth Industrial Estate Solar Park
Solar Photovoltaics · Operational
15.5 km

How big is Braydon Manor Farm?

Braydon Manor Farm has a recorded installed capacity of 8.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Braydon Manor Farm?

REPD records the operator as Public Power Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Braydon Manor Farm approved and built?

The application was submitted on 2013-06-12. Permission was granted on 2013-10-29, 5 months later. The site became operational on 2016-01-15, 27 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1974.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council