Novarly ParcelRenewable sites

Renewable sitesMinety South - Battery Storage

Minety South - Battery Storage

Minety South - Battery Storage is an operational 49.99 MW battery storage site in Wiltshire, generating since 1 October 2022. Planning permission was granted on 28 September 2017, 5 months after submission. Operator of record: Statera Energy.

49.99 MW
Capacity
as recorded in REPD
Operational
Status
since 1 October 2022
Battery
Technology
Statera Energy
Wiltshire
Authority
England

Planning and build timeline

Application submitted5 May 2017
Permission granted28 September 2017
5 months after submission
Operational1 October 2022
60 months after consent

Screening a site of your own?

RedlineUK · £39

Wiltshire approves 97% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Minety South - Battery Storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on battery storage

Wiltshire has decided 30 battery storage schemes and approved 97%, taking a median of 13.9 months. See every battery storage scheme decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Battery · Operational
49.991 km
Battery · Operational
501.2 km
Battery · Operational
501.2 km
Battery · Operational
501.2 km
Solar Photovoltaics · Operational
8.73.9 km
Solar Photovoltaics · Operational
14.54.8 km
Solar Photovoltaics · Operational
86.2 km
Advanced Conversion Technologies · Under Construction
66.7 km

How big is Minety South - Battery Storage?

Minety South - Battery Storage has a recorded installed capacity of 49.99 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Minety South - Battery Storage?

REPD records the operator as Statera Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Minety South - Battery Storage approved and built?

The application was submitted on 5 May 2017. Permission was granted on 28 September 2017, 5 months later. The site became operational on 1 October 2022, 60 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7184.