Solar planning in Wiltshire

Wiltshire has decided 103 solar farms and approved 93% of them, taking a median of 4 months to decide. Consented capacity: 1,059 MW. 15 applications still awaiting a decision.

93%
Approved
96 granted · 7 refused
4 mo
Median decision
UK 2.3 mo
1,059 MW
Consented
93 MW refused
5
Appeals
3 allowed on appeal

How Wiltshire compares

Against the 298 UK authorities with 5+ solar decisions, Wiltshire sits in the 35th percentile for approval rate (level with the England average) and the 15th percentile for speed.

Decisions by year

1020Approved — 3 (2011)311Approved — 3 (2012)3Approved — 14 (2013)Refused — 1 (2013)1513Approved — 15 (2014)Refused — 2 (2014)17Approved — 7 (2015)715Refused — 1 (2016)1Approved — 2 (2020)220Approved — 2 (2021)2Approved — 14 (2022)1422Approved — 10 (2023)10Approved — 13 (2024)1324Approved — 12 (2025)Refused — 2 (2025)14Approved — 1 (2026)Refused — 1 (2026)226
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (123)

SchemeMWStatusDecided
Hangar 45, Yatesbury - Extensions & Solar Panels
Carroll Holding Limited · PL/2026/00418
0.36Application Submitted2026-02-16
Chicklade EV Service Station - Solar Farm
Enviromena · PL/2026/00795
3Application Submitted2026-02-12
Chemring Countermeasures Limited, Netton - Solar Panels
Chemring Countermeasures · PL/2025/09805 · 1.6 mo to decide
0.25Application Refused2026-02-12
Tesco, County Way - Solar Photovoltaic Panels
Tesco Stores Limited · PL/2026/00636
0.15Application Submitted2026-01-30
The Salisbury Hospice, Salisbury District Hospital - Solar PV Panels
Salisbury NHS Foundation Trust · PL/2026/00613
0.21Application Submitted2026-01-29
Swallett Energy Park
Exagen · PL/2023/10077 · 25.6 mo to decide
23Awaiting Construction2026-01-21
Byde Mill Solar Farm, Poulshot - Solar Farm
Ampyr · PL/2024/11631 · 10.8 mo to decide
13.5Awaiting Construction2025-12-22
Salisbury District Hospital, Odstock Road - Solar PV
Salisbury NHS Foundation Trust · PL/2025/07284 · 2.8 mo to decide
0.26Awaiting Construction2025-12-17
North Park, Savernake - Solar Array
Tottenham Estate · PL/2025/03471 · 6.3 mo to decide
0.68Awaiting Construction2025-10-31
North Allington Solar Farm - Solar Farm
Noventum Power Limited · PL/2024/09410 · 10.9 mo to decide
10Awaiting Construction2025-09-26
Lambdown Terrace, Swinton Barracks - Solar Panels
Defence Infrastructure Organisation · PL/2025/01089 · 6.1 mo to decide
0.8Awaiting Construction2025-08-08
Beech Tree Solar Farm
Low Carbon UK Solar Investment Co Limited · PL/2023/10394 · 20 mo to decide
30Awaiting Construction2025-07-30
Mod Lyneham, Calne Road - Solar Array ( Project Cubit)
Kier Construction Southern Limited · PL/2025/06157
Application Submitted2025-07-29
Grain Dryer, Manor Farm, - Solar Panels
operator not recorded · PL/2025/04062 · 1.8 mo to decide
0.16Awaiting Construction2025-07-17
Potterne Park Farm, Potterne - Solar Farm
Potterne Solar Project Limited · PL/2023/10332 · 18.4 mo to decide
49.9Application Refused2025-07-03
Sloperton Farm, Westbrook - Solar Panels
BeBa Energy UK Limited · PL/2024/06048 · 10.3 mo to decide
0.34Awaiting Construction2025-06-10
Bentham House Farm, Mopes Lane - Solar Farm
Spring Dev 08 Limited · PL/2024/08441 · 8.4 mo to decide
12Awaiting Construction2025-06-06
Blounts Court Farm, Potterne - Solar Panels
Greenfield Energy Developments Limited · PL/2024/04926 · 11.6 mo to decide
15Application Refused2025-05-30
Hoopers Pool, Southwick - Solar Panels
Hoopers Pool Solar Farm Limited · PL/2025/04328
30Application Submitted2025-05-09
Salisbury District Hospital, Odstock Road - Solar Panels
Salisbury NHS Foundation Trust · PL/2025/02615 · 1.8 mo to decide
0.19Awaiting Construction2025-05-06
Blackthorn Solar Farm
Eden BD Solar Limited · PL/2025/03889
40Application Submitted2025-05-02
St Laurence School, Ashley Road - Solar Panels
Bath & West Community Energy · PL/2025/01249 · 1.4 mo to decide
0.19Awaiting Construction2025-04-04
Red Barn - Solar Farm & Battery Storage
Eden Renewables · PL/2023/08481 · 15.6 mo to decide
40Awaiting Construction2025-01-27
Interface Business Park, Bincknoll Lane - Solar Panels
NMM Warehouse Limited · PL/2024/04933 · 3.7 mo to decide
0.17Awaiting Construction2024-10-01
Washington Road, West Wilts Trading Estate - Solar Panels
Audience Systems Limited · PL/2024/07226 · 1.8 mo to decide
0.18Awaiting Construction2024-09-30
Apetito, Canal Road - Solar Panels
Apetito UK Limited · PL/2024/06620 · 1.6 mo to decide
1.33Awaiting Construction2024-09-12
Apetito, Canal Road - Solar Panels
Apetito UK Limited · PL/2024/03852 · 2.2 mo to decide
0.72Awaiting Construction2024-09-09
Whitefields Farm, Ogbourne St George - Solar PV Panels
Private Developer · PL/2024/04870 · 1.8 mo to decide
0.2Awaiting Construction2024-08-05
Sewage Works, Southampton Road - Solar Farm
Communities for Renewables CIC · PL/2023/06905
2Application Withdrawn2024-07-18
St Marys School, Curzon Street - Solar panels
St Marys School · PL/2024/02237 · 3.2 mo to decide
0.23Awaiting Construction2024-07-17
Codford Solar Farm Phase 4
JM Stratton & Company · PL/2023/03024 · 14 mo to decide
18Awaiting Construction2024-07-17
Larkhill Garrison Glover Road - Solar Photovoltaic Array
The Secretary of State for Defence · PL/2023/01992 · 15.5 mo to decide
Awaiting Construction2024-07-09
Chelworth Park, Chelworth Road - Solar Panels
GWP Packaging Limited · PL/2024/03653 · 1.8 mo to decide
0.31Awaiting Construction2024-06-12
Chemring Countermeasures Limited, High Post Road- Solar Array
The Logical Group · PL/2023/04203 · 11.7 mo to decide
Awaiting Construction2024-06-06
Springfield Community Campus, Beechfield Road - Solar Photovoltaic Arrays
Wiltshire Council · PL/2024/02711 · 1.2 mo to decide
0.16Awaiting Construction2024-04-19
Morrisons, West Cepen Way - Solar Panels
Gondola Pro · PL/2024/00519 · 1.8 mo to decide
0.3Awaiting Construction2024-03-22
Salisbury District Hospital, Odstock Road - Solar Panels
Salisbury NHS Foundation Trust · PL/2023/10887 · 1.6 mo to decide
0.76Awaiting Construction2024-03-01
Sands Farm Quarry, Low Lane - Solar Panels
Valencia Waster Management Limited · PL/2024/01599
6Application Submitted2024-02-28
Ashley Garage - Solar PV Array
Ashley Garage Limited · PL/2023/07741
1.07Application Withdrawn2024-02-07
Malmesbury Road Solar Farm
Wessex Solar Energy Limited · PL/2021/09153 · 25.1 mo to decide
13Awaiting Construction2023-10-26
Storridge Road - Solar Farm
NextPower SPV 15 Limited · PL/2021/10592 · 22.4 mo to decide
31Awaiting Construction2023-10-12
Crudwell Road Solar Farm & Battery Storage
Five Lanes Solar Limited · 20/08618/FUL · 28.9 mo to decide
49.9Awaiting Construction2023-08-23
Stowford Manor Farm, Farleigh Road - Solar Panels
Stowford Manor Farm · PL/2023/02500 · 2.8 mo to decide
0.16Awaiting Construction2023-07-05
Moonraker Farm, Gastard - Solar Panels
Moonraker Farm · PL/2023/03023 · 2 mo to decide
0.25Awaiting Construction2023-06-15
Herman Miller, Portal Road - Solar Panels
Cactus Energy · PL/2023/01314 · 1.8 mo to decide
0.58Awaiting Construction2023-04-20
Mopes Lane, Purton - Solar Farm
Spring Dev 08 Limited · PL/2021/10405 · 17.3 mo to decide
20Awaiting Construction2023-04-15
Wiltshire College, Lackham - Solar Panels
Wessex Energy Solutions · PL/2022/09178 · 2.7 mo to decide
0.32Awaiting Construction2023-04-12
Forest Gate - Solar Farm & Battery Storage
Eden Renewables · PL/2021/06112 · 20.9 mo to decide
49.9Awaiting Construction2023-03-10
Whistle Mead Solar Farm, Little Chalfield - Solar Farm
Private Developer · PL/2023/01914
Application Submitted2023-03-06
Moonraker Farm, Gastard - Solar Panels
Moonraker Farm · PL/2022/09590 · 1.8 mo to decide
0.25Revised2023-02-08
Wiltshire college, College Road - Solar Panels
Wessex Energy Solutions Limited · PL/2022/08335 · 2.3 mo to decide
0.16Awaiting Construction2023-01-06
St Modwen Park, Motorway - Solar Panels
Furniture Box · PL/2022/06856 · 3.2 mo to decide
0.19Awaiting Construction2022-12-29
Morrisons, Weymouth Street - Solar Panels
Morrisons · PL/2022/08326 · 1.8 mo to decide
0.23Awaiting Construction2022-12-22
Cooles Farm, Minety - Solar Park/Battery Storage
Ecotricity Generation Limited · PL/2022/08634
8Application Submitted2022-11-07
Westbury Sewage Treatment Works, Slag Lane - Solar Panels
Wessex Water · PL/2022/06569 · 2 mo to decide
Awaiting Construction2022-10-24
Parsonage Way - Solar Panels
Wavin Plastic Limited · PL/2022/05444 · 2.5 mo to decide
1.6Awaiting Construction2022-10-11
Ratfyn Water Recycling Centre, Amesbury - Solar Panels
Private Developer · PL/2022/06564 · 1.5 mo to decide
0.3Awaiting Construction2022-10-07
Edinburgh Way - Solar Photovolatic Panel
EDF Energy Renewables · PL/2022/05332 · 1.7 mo to decide
0.7Awaiting Construction2022-09-15
Batten Road, Downton - Solar Photovoltaic Panels
Bidfood · PL/2022/05023 · 1.7 mo to decide
0.51Awaiting Construction2022-08-22
Leigh Delamere - Solar farm & Battery storage
Eden Renewables · PL/2021/06100 · 13.9 mo to decide
49.9Under Construction2022-08-11
Studley Farm - Solar Farm & Battery Storage
Melksham Calne Green Limited · PL/2021/08690 · 8.3 mo to decide
49.9Awaiting Construction2022-06-09
Hulse Road - Solar Panels
Wiltshire Council · PL/2022/00733 · 3.3 mo to decide
0.16Awaiting Construction2022-05-06
Minety Substation
JBM Solar Project · 20/03528/FUL · 23.3 mo to decide
40Awaiting Construction2022-04-07
Whaddon Lane, Hilperton
British Solar Renewables · PL/2021/03061 · 10.9 mo to decide
25Awaiting Construction2022-04-06
Hulse Road - Solar Panels
Wiltshire Council · PL/2022/02373 · 1.8 mo to decide
0.41Awaiting Construction2022-03-23
Salisbury City Hall - Solar PV Panels
Wiltshire Council · PL/2021/11096 · 1.8 mo to decide
0.18Awaiting Construction2022-02-13
Wick Farm Melksham Substation
JBM Solar Projects · 20/06840/FUL · 15.9 mo to decide
49.9Under Construction2021-12-17
Bourne Hill Council Office
Wiltshire Council · 21/00168/DP3 · 1.5 mo to decide
Awaiting Construction2021-02-27
HM Erlestoke Solar Array
Ministry of Justice · 20/11600/FUL
0.21Application Submitted2020-12-24
East Codford Solar Farm Extension Phase 3
Centrica Plc · 19/03576/FUL · 20.4 mo to decide
18Operational2020-12-18
Down Barn Farm
Scottish Power Renewables · 19/10890/FUL · 5.3 mo to decide
49.9Awaiting Construction2020-04-23
East Farm (Clay Pit Hill) - Extension II
J.M. Stratton and Co Ltd · 18/03167/FUL
6Application Withdrawn2018-12-01
Land At Moor Lane Farm
Elgar Middleton · 15/07244/FUL · 11.8 mo to decide
4.5Application Refused2016-08-19
Land north of Ashton Road
Conergy · 15/07413/FUL · 5 mo to decide
4Operational2015-12-22
Park Grounds Farm
Earthworm Energy · 15/07373/FUL · 4 mo to decide
5Abandoned2015-12-10
Brook Hall Farm
South West Solar Parks (Brook Hall Farm SPV) · 15/05656/FUL · 5.5 mo to decide
4.7Operational2015-11-26
Land at Poles Hole Farm
Sunsave 13 (Southwick) · 15/04583/FUL · 5.3 mo to decide
6.8Operational2015-10-29
Land West Side of Axe and Cleaver Lane
Wessex Solar Energy · 15/04570/FUL · 3.2 mo to decide
5Operational2015-08-20
Snarlton Farm (Melksham solar farm)
Foresight · 13/06140/FUL · 18.9 mo to decide
49.6Operational2015-06-18
Trowle Common
Low Carbon · 14/11649/FUL · 5.3 mo to decide
5Operational2015-06-15
Brook Hall Farm
South West Solar Parks (Brook Hall Farm SPV) · 15/01199/FUL
10Revised2015-05-11
Bake Farm Solar Farm
British Solar Renewables · 14/10548/FUL · 3.6 mo to decide
5Operational2015-03-05
Manor Farm (Wiltshire)
RB & T Barton Ltd · 14/03084/FUL · 9.2 mo to decide
6.3Operational2014-12-23
Bentham Farm
Hive Energy · 13/04872/FUL · 14.2 mo to decide
8Operational2014-12-15
Land east of Littledown Business Park
Lightsource Renewable Energy · 14/06350/FUL · 5.3 mo to decide
6.2Operational2014-12-09
Boscombe Airfield
Lark Energy · 14/05740/FUL · 5.4 mo to decide
12.3Operational2014-11-24
Bradenstoke solar park
Defence Infrastructure Organisation / BSR · 14/06989/FUL · 3.7 mo to decide
69.8Operational2014-11-13
Castle Combe Circuit
Sunsave 17 / Vogt Solar · 14/06821/FUL · 3.8 mo to decide
12Operational2014-11-10
Bake Farm
COOMBE BISSETT PV PARK LIMITED · 14/06864/FUL · 3.4 mo to decide
14.3Revised2014-10-22
Little Chalfield Solar Farm
Solar Planning · 14/05253/FUL · 4 mo to decide
12Appeal Refused2014-09-29
Bollands Hill
Green Switch Developments · 14/03736/FUL · 5.2 mo to decide
4Appeal Refused2014-09-09
Cockhill Solar Farm
Next Energy Solar Fund Ltd · 14/05596/FUL · 2.6 mo to decide
20Operational2014-08-28
Lower End Farm
Good Energy Generation · 14/02273/FUL · 5.5 mo to decide
4.9Operational2014-08-26
Water Eaton Farm / Port Farm
Foresight/ Vogt solar · 14/04326/FUL · 3.9 mo to decide
34.8Operational2014-08-21
Rock Farm / Goldborough Farm (Rookwood)
Good Energy Generation · 13/07071/FUL · 6.5 mo to decide
5Operational2014-07-07
Bake Farm
COOMBE BISSETT PV PARK LIMITED · 13/06336/FUL
16.1Application Withdrawn2014-06-18
Wickfield Farm
NESF (formerly A C Crocker Properties Ltd) · 14/02508/FUL · 3 mo to decide
5Operational2014-06-05
Roundponds Farm Solar Park
Hive Energy · 13/06707/FUL · 4.4 mo to decide
13.5Operational2014-05-23
Marsh Farm Hilperton
Foresight · 14/00592/FUL · 3 mo to decide
9.1Operational2014-04-30
Lodge Farm (Poulshot)
Hive Energy · 13/05244/FUL · 4.2 mo to decide
14.5Operational2014-02-27
Land at East Farm - extension
J.M. Stratton & Co. · 13/05001/FUL · 3 mo to decide
6Operational2014-01-07
Manor Farm (Wiltshire)
RB & T Barton Ltd · 13/04055/FUL · 2.9 mo to decide
9.6Revised2013-12-18
Stokes Marsh Farm
South West Solar Parks · 13/02309/FUL · 4.6 mo to decide
16.6Operational2013-12-18
Deptford Farm solar park
Brilliant Harvest Installations · 13/00699/FUL · 6.6 mo to decide
7.8Application Refused2013-12-10
Spittleborough Farm
MTS Spittleborough Solar Ltd · 13/02191/FUL · 4.8 mo to decide
12Operational2013-12-09
Blenches Mill
NextEnery Solar Fund (NESF) · W/12/02081/FUL · 12.2 mo to decide
6.1Operational2013-11-28
Hullavington Solar Park
Wessex Solar Energy · 13/01495/FUL · 5.7 mo to decide
7Operational2013-11-13
Braydon Manor Farm
Public Power Solutions · 13/01723/FUL · 4.6 mo to decide
8.7Operational2013-10-29
Westbury (Closed) Landfill Site
Viridor · 13/01962/WCM · 3.2 mo to decide
3.5Operational2013-10-21
High Penn Solar Park
Hive Energy · 12/04169/FUL · 7.4 mo to decide
9.6Operational2013-10-08
NEWNTON DAIRY FARM
Anesco · 13/01561/FUL · 3 mo to decide
7.2Operational2013-09-10
Hopton Road Industrial Estate
Hopton PV Ltd · 13/00984/FUL · 1.9 mo to decide
1.3Operational2013-08-30
Battens Farm Solar Park
Battens Farm Solar Park Ltd · 13/01311/FUL · 3 mo to decide
11Operational2013-08-08
Norrington Common Solar Farm
Terraform Power (SunEdison) · W/12/02072/FUL · 5.1 mo to decide
10Operational2013-04-25
Chelworth Industrial Estate Solar Park
Bath & West Community Energy Ltd · 12/03968/FUL · 4.5 mo to decide
1Operational2013-04-22
Land at East Farm
Anesco · W/12/02216/FUL · 2.5 mo to decide
6.8Operational2013-03-19
Marsh Farm
Steadfast Marsh Solar - Innogy (previously BELECTRIC Solar) · 12/02104/FUL · 5.7 mo to decide
14Operational2013-01-15
RUDGE FARM SOLAR FARM
Orta Solar · E/2012/0946/FUL · 4.9 mo to decide
7Operational2012-12-21
Rodbourne Rail Farm - Solar Park
British Solar Renewables · 12/01122/FUL · 5.7 mo to decide
7.6Operational2012-11-13
CRAYSMARSH SOLAR FARM
Lightsource BP · W/12/00467/FUL · 3 mo to decide
1.8Operational2012-06-20
Malmesbury Solar
Sunstroom Energy · 11/01081/FUL · 2 mo to decide
5Operational2011-05-26
Kingston Farm
BOA Property / AEE Renewables UK · W/11/01064/FUL · 1.5 mo to decide
5Operational2011-05-17
Lake Farm
AEE Renewables · 11/00003/FUL · 2.9 mo to decide
5Operational2011-04-11

Does Wiltshire approve solar farms?

Yes — of the 103 solar farms Wiltshire has decided, 93% were approved (96 granted, 7 refused). The UK-wide rate for solar is 93%.

How long does a solar farm application take in Wiltshire?

The median time from application to decision is 4 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Wiltshire consented?

1,059 MW has been consented across 96 approved schemes, with 93 MW refused. A further 15 applications awaits a decision.

Other technologies in Wiltshire

Battery storage in WiltshireOnshore wind in Wiltshire

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.