Novarly ParcelRenewable sites

Renewable sitesChapel Farm

Chapel Farm

Chapel Farm is an operational 5 MW solar farm in Swindon, generating since 31 March 2017. Planning permission was granted on 10 August 2015, 1 months after submission. Operator of record: Public Power Solutions/ Swindon Borough Council.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2017
Solar Photovoltaics
Technology
Public Power Solutions/ Swindon Borough Council
Swindon
Authority
England

Planning and build timeline

Application submitted6 July 2015
Permission granted10 August 2015
1 months after submission
Operational31 March 2017
20 months after consent

Screening a site of your own?

RedlineUK · £39

Swindon approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Chapel Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Swindon’s record on solar

Swindon has decided 35 solar farms and approved 100%, taking a median of 2.1 months. See every solar farm decision in Swindon

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
30.6 km
Solar Photovoltaics · Under Construction
0.913.3 km
Solar Photovoltaics · Operational
34.83.4 km
Battery · Under Construction
64.3 km
Solar Photovoltaics · Operational
2.54.4 km
Solar Photovoltaics · Operational
17.84.4 km
Solar Photovoltaics · Operational
54.6 km
Anaerobic Digestion · Operational
1.25.1 km

How big is Chapel Farm?

Chapel Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chapel Farm?

REPD records the operator as Public Power Solutions/ Swindon Borough Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chapel Farm approved and built?

The application was submitted on 6 July 2015. Permission was granted on 10 August 2015, 1 months later. The site became operational on 31 March 2017, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4769.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode