Novarly ParcelRenewable sites

Renewable sitesBentham Farm

Bentham Farm

Bentham Farm is operational in Wiltshire with a recorded capacity of 8 MW, and has been generating since 2015-07-15.

8 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-07-15
Solar Photovoltaics
Technology
Hive Energy
Wiltshire
Authority
England

Planning and build timeline

Application submitted2013-10-08
Permission granted2014-12-15
14 months after submission
Operational2015-07-15
7 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on solar

Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Chelworth Industrial Estate Solar Park
Solar Photovoltaics · Operational
12.6 km
Braydon Manor Farm
Solar Photovoltaics · Operational
8.73.2 km
Chapel Farm
Solar Photovoltaics · Operational
55.7 km
Swindon Energy Plant (Park Grounds)
Advanced Conversion Technologies · Under Construction
66 km
Minety South - Battery Storage
Battery · Operational
49.996.2 km
Chapel Farm Landfill
Landfill Gas · Operational
36.3 km
Spittleborough Farm
Solar Photovoltaics · Operational
126.7 km
Brindley Close (Extension)
Battery · Under Construction
66.8 km

How big is Bentham Farm?

Bentham Farm has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bentham Farm?

REPD records the operator as Hive Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bentham Farm approved and built?

The application was submitted on 2013-10-08. Permission was granted on 2014-12-15, 14 months later. The site became operational on 2015-07-15, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2344.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council