Renewable sites › Water Eaton Farm / Port Farm
Water Eaton Farm / Port Farm
Water Eaton Farm / Port Farm is operational in Wiltshire with a recorded capacity of 34.8 MW, and has been generating since 2015-03-25.
Planning and build timeline
| Application submitted | 2014-04-25 |
| Permission granted | 2014-08-21 4 months after submission |
| Operational | 2015-03-25 7 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Wiltshire’s record on solar
Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Castle Eaton Farm Solar Photovoltaics · Operational | 17.8 | 2 km |
Chapel Farm Landfill Landfill Gas · Operational | 3 | 3.1 km |
Chapel Farm Solar Photovoltaics · Operational | 5 | 3.4 km |
Chelworth Industrial Estate Solar Park Solar Photovoltaics · Operational | 1 | 5.1 km |
Stanton solar park Solar Photovoltaics · Operational | 5 | 5.4 km |
Arkwright Road, Groundwell Industrial Estate - Solar Panels Solar Photovoltaics · Under Construction | 0.91 | 5.8 km |
Pentylands Farm Solar Photovoltaics · Operational | 19 | 6.1 km |
Corner Copse Solar Farm Solar Photovoltaics · Under Construction | 49.9 | 6.4 km |
How big is Water Eaton Farm / Port Farm?
Water Eaton Farm / Port Farm has a recorded installed capacity of 34.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Water Eaton Farm / Port Farm?
REPD records the operator as Foresight/ Vogt solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Water Eaton Farm / Port Farm approved and built?
The application was submitted on 2014-04-25. Permission was granted on 2014-08-21, 4 months later. The site became operational on 2015-03-25, 7 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2085.
Novarly Parcel · official public data, read properly · parcel.novarly.com