Novarly ParcelRenewable sites

Renewable sitesNorlands Lane Landfill Site (Extension)

Norlands Lane Landfill Site (Extension)

Norlands Lane Landfill Site (Extension) is an operational 4 MW landfill gas site in Runnymede, generating since 1 February 2004. Planning permission was granted on 29 December 2003, 2 months after submission. Operator of record: Thames Waste Management.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 1 February 2004
Landfill Gas
Technology
Thames Waste Management
Runnymede
Authority
England

Planning and build timeline

Application submitted14 October 2003
Permission granted29 December 2003
2 months after submission
Operational1 February 2004
1 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Runnymede: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Norlands Lane Landfill Site (Extension)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.71 km
Solar Photovoltaics · Operational
1.32.7 km
Solar Photovoltaics · Operational
4.84.5 km
Landfill Gas · Operational
2.95 km
Anaerobic Digestion · Operational
1.75.2 km
Advanced Conversion Technologies · Under Construction
3.65.2 km
Anaerobic Digestion · Operational
2.45.2 km
Biomass (dedicated) · Operational
1.86.5 km

How big is Norlands Lane Landfill Site (Extension)?

Norlands Lane Landfill Site (Extension) has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Norlands Lane Landfill Site (Extension)?

REPD records the operator as Thames Waste Management. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Norlands Lane Landfill Site (Extension) approved and built?

The application was submitted on 14 October 2003. Permission was granted on 29 December 2003, 2 months later. The site became operational on 1 February 2004, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 790.