Bumpers Lane Solar Farm is operational in Buckinghamshire with a recorded capacity of 13.3 MW, and has been generating since 2020-03-16.

13.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2020-03-16
Battery
Technology
Anesco
Buckinghamshire
Authority
England

Planning and build timeline

Application submitted2016-11-23
Permission grantednot recorded
Operational2020-03-16

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Buckinghamshire’s record on battery storage

Buckinghamshire has decided 11 battery storage schemes and approved 82%, taking a median of 9 months. See every battery storage scheme decision in Buckinghamshire

Other built sites within 15 km

SiteMWDistance
Bumpers Farm Phase 1
Solar Photovoltaics · Operational
50.6 km
Thame solar farm
Solar Photovoltaics · Operational
4.33 km
The Oxfordshire Golf Club
Solar Photovoltaics · Operational
0.38.9 km
Quarrendon Fields
Wind Onshore · Operational
1.510.7 km
Westcott Venture Park Phase 2 & 3
Solar Photovoltaics · Operational
1.311.2 km
Westcott Venture Park
Anaerobic Digestion · Operational
212.3 km
Gib Lane (Aston Clinton solar park)
Solar Photovoltaics · Operational
24.212.7 km
Arla Dairy Site
Anaerobic Digestion · Operational
513 km

How big is Bumpers Lane Solar Farm?

Bumpers Lane Solar Farm has a recorded installed capacity of 13.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bumpers Lane Solar Farm?

REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bumpers Lane Solar Farm approved and built?

The application was submitted on 2016-11-23. REPD does not record a grant date. The site became operational on 2020-03-16.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6913.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council