Novarly ParcelRenewable sites

Renewable sitesQuarrendon Fields

Quarrendon Fields

Quarrendon Fields is operational in Buckinghamshire with a recorded capacity of 1.5 MW, and has been generating since 2014-12-18.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-12-18
Wind Onshore
Technology
AWE Renewables
Buckinghamshire
Authority
England

Planning and build timeline

Application submitted2010-02-15
Permission granted2012-03-19
25 months after submission
Operational2014-12-18
33 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Folly Farm
Solar Photovoltaics · Operational
13.16.7 km
Gib Lane Solar farm (Extension)
Solar Photovoltaics · Operational
57.1 km
Arla Dairy Site
Anaerobic Digestion · Operational
57.2 km
Gib Lane (Aston Clinton solar park)
Solar Photovoltaics · Operational
24.27.9 km
Westcott Venture Park Phase 2 & 3
Solar Photovoltaics · Operational
1.38.3 km
Westcott Venture Park
Anaerobic Digestion · Operational
29.9 km
Bumpers Lane Solar Farm
Battery · Operational
13.310.7 km
Bumpers Farm Phase 1
Solar Photovoltaics · Operational
511.3 km

How big is Quarrendon Fields?

Quarrendon Fields has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Quarrendon Fields?

REPD records the operator as AWE Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Quarrendon Fields approved and built?

The application was submitted on 2010-02-15. Permission was granted on 2012-03-19, 25 months later. The site became operational on 2014-12-18, 33 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4908.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council