Renewable sites › The Oxfordshire Golf Club
The Oxfordshire Golf Club
The Oxfordshire Golf Club is operational in South Oxfordshire with a recorded capacity of 0.3 MW, and has been generating since 2019-11-01.
Planning and build timeline
| Application submitted | 2019-05-10 |
| Permission granted | not recorded |
| Operational | 2019-11-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
South Oxfordshire’s record on solar
South Oxfordshire has decided 22 solar farms and approved 95%, taking a median of 4.2 months. See every solar farm decision in South Oxfordshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Thame solar farm Solar Photovoltaics · Operational | 4.3 | 6 km |
Easington Farm (Chalgrove) Solar Photovoltaics · Operational | 21.3 | 7.1 km |
Bumpers Farm Phase 1 Solar Photovoltaics · Operational | 5 | 8.5 km |
Bumpers Lane Solar Farm Battery · Operational | 13.3 | 8.9 km |
Langley Hall Farm Solar Photovoltaics · Operational | 2.4 | 9.2 km |
Cowley electricity sub-station Battery · Operational | 49.9 | 11.9 km |
BMW UK Manufacturing Ltd Solar Photovoltaics · Operational | 3 | 12.4 km |
Wally Corner Landfill Site Solar Photovoltaics · Operational | 7 | 12.8 km |
How big is The Oxfordshire Golf Club?
The Oxfordshire Golf Club has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates The Oxfordshire Golf Club?
REPD records the operator as The Oxfordshire Golf Club. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was The Oxfordshire Golf Club approved and built?
The application was submitted on 2019-05-10. REPD does not record a grant date. The site became operational on 2019-11-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7381.