Bumpers Farm Phase 1

Bumpers Farm Phase 1 is operational in Buckinghamshire with a recorded capacity of 5 MW, and has been generating since 2017-03-25.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-25
Solar Photovoltaics
Technology
Solar Planning
Buckinghamshire
Authority
England

Planning and build timeline

Application submitted2014-07-11
Permission granted2015-10-26
16 months after submission
Operational2017-03-25
17 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Buckinghamshire’s record on solar

Buckinghamshire has decided 59 solar farms and approved 90%, taking a median of 3 months. See every solar farm decision in Buckinghamshire

Other built sites within 15 km

SiteMWDistance
Bumpers Lane Solar Farm
Battery · Operational
13.30.6 km
Thame solar farm
Solar Photovoltaics · Operational
4.32.7 km
The Oxfordshire Golf Club
Solar Photovoltaics · Operational
0.38.5 km
Quarrendon Fields
Wind Onshore · Operational
1.511.3 km
Westcott Venture Park Phase 2 & 3
Solar Photovoltaics · Operational
1.311.6 km
Westcott Venture Park
Anaerobic Digestion · Operational
212.6 km
Gib Lane (Aston Clinton solar park)
Solar Photovoltaics · Operational
24.213.2 km
Arla Dairy Site
Anaerobic Digestion · Operational
513.6 km

How big is Bumpers Farm Phase 1?

Bumpers Farm Phase 1 has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bumpers Farm Phase 1?

REPD records the operator as Solar Planning. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bumpers Farm Phase 1 approved and built?

The application was submitted on 2014-07-11. Permission was granted on 2015-10-26, 16 months later. The site became operational on 2017-03-25, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2186.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council