Briar Solar Farm is operational in Norwich with a recorded capacity of 1.9 MW, and has been generating since 2017-03-20.
Planning and build timeline
| Application submitted | 2015-07-24 |
| Permission granted | 2016-06-16 11 months after submission |
| Operational | 2017-03-20 9 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Yare Broads and Marshes
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Norwich’s record on solar
Norwich has decided 6 solar farms and approved 100%, taking a median of 1.4 months. See every solar farm decision in Norwich →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
New Road Solar Farm Solar Photovoltaics · Under Construction | 5 | 4.2 km |
Costessey Landfill Gas Project 2 Landfill Gas · Operational | 2 | 4.4 km |
Land East of White Horse Lane Solar Photovoltaics · Operational | 5 | 5.5 km |
Reepham Road (Waste AD) Anaerobic Digestion · Operational | 1.5 | 7.2 km |
Spring Farm (biomass) Anaerobic Digestion · Operational | 1 | 7.6 km |
Attlebridge Landfill Site Landfill Gas · Operational | 1.3 | 8.2 km |
Bracon Ash Solar Solar Photovoltaics · Under Construction | 28.5 | 9.8 km |
Bracon Ash Solar Battery · Under Construction | — | 9.8 km |
How big is Briar Solar Farm?
Briar Solar Farm has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Briar Solar Farm?
REPD records the operator as NR16/ RenEnergy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Briar Solar Farm approved and built?
The application was submitted on 2015-07-24. Permission was granted on 2016-06-16, 11 months later. The site became operational on 2017-03-20, 9 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5720.