New Road Solar Farm
New Road Solar Farm is a 5 MW solar farm under construction in South Norfolk. Planning permission was granted on 2 November 2015, 3 months after submission. Operator of record: Solar Century/ Bluefield Solar.
Planning and build timeline
| Application submitted | 23 July 2015 |
| Permission granted | 2 November 2015 3 months after submission |
| Operational | not recorded |
Screening a site of your own?
South Norfolk approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with New Road Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Yare Broads and Marshes
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
South Norfolk’s record on solar
South Norfolk has decided 28 solar farms and approved 96%, taking a median of 4.2 months. See every solar farm decision in South Norfolk →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 2 | 1.5 km |
Solar Photovoltaics · Operational | 1.9 | 4.2 km |
Anaerobic Digestion · Operational | 1.5 | 7 km |
Landfill Gas · Operational | 1.3 | 7 km |
Anaerobic Digestion · Operational | 1 | 7 km |
Battery · Under Construction | 30 | 7.4 km |
Solar Photovoltaics · Under Construction | 30 | 7.4 km |
Solar Photovoltaics · Operational | 5 | 8.2 km |
How big is New Road Solar Farm?
New Road Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates New Road Solar Farm?
REPD records the operator as Solar Century/ Bluefield Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was New Road Solar Farm approved and built?
The application was submitted on 23 July 2015. Permission was granted on 2 November 2015, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5543.