New Road Solar Farm is under construction in South Norfolk with a recorded capacity of 5 MW.

5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Solar Century/ Bluefield Solar
South Norfolk
Authority
England

Planning and build timeline

Application submitted2015-07-23
Permission granted2015-11-02
3 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Norfolk’s record on solar

South Norfolk has decided 28 solar farms and approved 96%, taking a median of 4.2 months. See every solar farm decision in South Norfolk

Other built sites within 15 km

SiteMWDistance
Costessey Landfill Gas Project 2
Landfill Gas · Operational
21.5 km
Briar Solar Farm
Solar Photovoltaics · Operational
1.94.2 km
Reepham Road (Waste AD)
Anaerobic Digestion · Operational
1.57 km
Attlebridge Landfill Site
Landfill Gas · Operational
1.37 km
Spring Farm (biomass)
Anaerobic Digestion · Operational
17 km
Colton - Solar photovoltaic farm, Battery storage
Battery · Under Construction
307.4 km
Colton - Solar photovoltaic farm, Battery storage
Solar Photovoltaics · Under Construction
307.4 km
Land East of White Horse Lane
Solar Photovoltaics · Operational
58.2 km

How big is New Road Solar Farm?

New Road Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates New Road Solar Farm?

REPD records the operator as Solar Century/ Bluefield Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was New Road Solar Farm approved and built?

The application was submitted on 2015-07-23. Permission was granted on 2015-11-02, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5543.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council