Novarly ParcelRenewable sites

Renewable sitesBracon Ash Solar

Bracon Ash Solar

Bracon Ash Solar is under construction in South Norfolk with a recorded capacity of 28.5 MW.

28.5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Luminous Energy Ltd
South Norfolk
Authority
England

Planning and build timeline

Application submitted2021-03-12
Permission granted2021-12-21
9 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Norfolk’s record on solar

South Norfolk has decided 28 solar farms and approved 96%, taking a median of 4.2 months. See every solar farm decision in South Norfolk

Other built sites within 15 km

SiteMWDistance
Bracon Ash Solar
Battery · Under Construction
0 km
The Everest System
Battery · Operational
0.12.1 km
Land south of Brick Kiln Road
Solar Photovoltaics · Operational
52.8 km
Land East of White Horse Lane
Solar Photovoltaics · Operational
58 km
New Road Solar Farm
Solar Photovoltaics · Under Construction
58.6 km
Hall Farm Solar park
Solar Photovoltaics · Operational
159.7 km
Briar Solar Farm
Solar Photovoltaics · Operational
1.99.8 km
Costessey Landfill Gas Project 2
Landfill Gas · Operational
210.1 km

How big is Bracon Ash Solar?

Bracon Ash Solar has a recorded installed capacity of 28.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bracon Ash Solar?

REPD records the operator as Luminous Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bracon Ash Solar approved and built?

The application was submitted on 2021-03-12. Permission was granted on 2021-12-21, 9 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8148.

Novarly Parcel · official public data, read properly · parcel.novarly.com