Novarly ParcelRenewable sites

Renewable sitesBracon Ash Solar

Bracon Ash Solar

Bracon Ash Solar is a battery storage site under construction in South Norfolk. Planning permission was granted on 21 December 2021, 9 months after submission. Operator of record: Luminous Energy Ltd.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Luminous Energy Ltd
South Norfolk
Authority
England

Planning and build timeline

Application submitted12 March 2021
Permission granted21 December 2021
9 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

South Norfolk approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bracon Ash Solar’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Norfolk’s record on battery storage

South Norfolk has decided 12 battery storage schemes and approved 100%, taking a median of 4.6 months. See every battery storage scheme decision in South Norfolk

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
28.50 km
Battery · Operational
0.12.1 km
Solar Photovoltaics · Operational
52.8 km
Solar Photovoltaics · Operational
58.1 km
Solar Photovoltaics · Under Construction
58.6 km
Solar Photovoltaics · Operational
159.7 km
Solar Photovoltaics · Operational
1.99.8 km
Landfill Gas · Operational
210.1 km

How big is Bracon Ash Solar?

REPD does not record an installed capacity for Bracon Ash Solar.

Who operates Bracon Ash Solar?

REPD records the operator as Luminous Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bracon Ash Solar approved and built?

The application was submitted on 12 March 2021. Permission was granted on 21 December 2021, 9 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8838.