Renewable sites › Bracon Ash Solar
Bracon Ash Solar
Bracon Ash Solar is a battery storage site under construction in South Norfolk. Planning permission was granted on 21 December 2021, 9 months after submission. Operator of record: Luminous Energy Ltd.
Planning and build timeline
| Application submitted | 12 March 2021 |
| Permission granted | 21 December 2021 9 months after submission |
| Operational | not recorded |
Screening a site of your own?
South Norfolk approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Bracon Ash Solar’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Yare Broads and Marshes
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
South Norfolk’s record on battery storage
South Norfolk has decided 12 battery storage schemes and approved 100%, taking a median of 4.6 months. See every battery storage scheme decision in South Norfolk →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 28.5 | 0 km |
Battery · Operational | 0.1 | 2.1 km |
Solar Photovoltaics · Operational | 5 | 2.8 km |
Solar Photovoltaics · Operational | 5 | 8.1 km |
Solar Photovoltaics · Under Construction | 5 | 8.6 km |
Solar Photovoltaics · Operational | 15 | 9.7 km |
Solar Photovoltaics · Operational | 1.9 | 9.8 km |
Landfill Gas · Operational | 2 | 10.1 km |
How big is Bracon Ash Solar?
REPD does not record an installed capacity for Bracon Ash Solar.
Who operates Bracon Ash Solar?
REPD records the operator as Luminous Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bracon Ash Solar approved and built?
The application was submitted on 12 March 2021. Permission was granted on 21 December 2021, 9 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8838.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode