Renewable sites › Bracon Ash Solar
Bracon Ash Solar
Bracon Ash Solar is under construction in South Norfolk.
Planning and build timeline
| Application submitted | 2021-03-12 |
| Permission granted | 2021-12-21 9 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Yare Broads and Marshes
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
South Norfolk’s record on battery storage
South Norfolk has decided 12 battery storage schemes and approved 100%, taking a median of 4.6 months. See every battery storage scheme decision in South Norfolk →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bracon Ash Solar Solar Photovoltaics · Under Construction | 28.5 | 0 km |
The Everest System Battery · Operational | 0.1 | 2.1 km |
Land south of Brick Kiln Road Solar Photovoltaics · Operational | 5 | 2.8 km |
Land East of White Horse Lane Solar Photovoltaics · Operational | 5 | 8.1 km |
New Road Solar Farm Solar Photovoltaics · Under Construction | 5 | 8.6 km |
Hall Farm Solar park Solar Photovoltaics · Operational | 15 | 9.7 km |
Briar Solar Farm Solar Photovoltaics · Operational | 1.9 | 9.8 km |
Costessey Landfill Gas Project 2 Landfill Gas · Operational | 2 | 10.1 km |
How big is Bracon Ash Solar?
REPD does not record an installed capacity for Bracon Ash Solar.
Who operates Bracon Ash Solar?
REPD records the operator as Luminous Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bracon Ash Solar approved and built?
The application was submitted on 2021-03-12. Permission was granted on 2021-12-21, 9 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8838.
Novarly Parcel · official public data, read properly · parcel.novarly.com