Novarly ParcelRenewable sites

Renewable sitesMelton Ross

Melton Ross

Melton Ross is operational in North Lincolnshire with a recorded capacity of 5.8 MW.

5.8 MW
Capacity
as recorded in REPD
Operational
Status
no operational date
Advanced Conversion Technologies
Technology
Singleton Birch / Energos
North Lincolnshire
Authority
England

Planning and build timeline

Application submitted2013-03-25
Permission granted2013-07-04
3 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Singleton Birch (Farm AD)
Anaerobic Digestion · Operational
1.50.7 km
Bonby Lane
Anaerobic Digestion · Operational
1.58.7 km
Atherton Way - Solar Panels
Solar Photovoltaics · Operational
0.249.4 km
Brigg Renewable Energy Plant
Biomass (dedicated) · Operational
4010.8 km
Immingham
Landfill Gas · Operational
212.2 km
Immingham Landfill Scheme
Landfill Gas · Operational
112.2 km
Trondheim Way Battery energy storage
Battery · Under Construction
8012.4 km
Grimsby Solar Farm
Solar Photovoltaics · Under Construction
49.912.9 km

How big is Melton Ross?

Melton Ross has a recorded installed capacity of 5.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Melton Ross?

REPD records the operator as Singleton Birch / Energos. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Melton Ross approved and built?

The application was submitted on 2013-03-25. Permission was granted on 2013-07-04, 3 months later. REPD does not record an operational date.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5347.