Renewable sites › Brigg Renewable Energy Plant
Brigg Renewable Energy Plant
Brigg Renewable Energy Plant is operational in North Lincolnshire with a recorded capacity of 40 MW, and has been generating since 2016-02-23.
Planning and build timeline
| Application submitted | 2009-03-23 |
| Permission granted | 2011-10-18 31 months after submission |
| Operational | 2016-02-23 52 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Atherton Way - Solar Panels Solar Photovoltaics · Operational | 0.24 | 1.9 km |
Raventhorpe Farm Solar Photovoltaics · Operational | 38 | 5.2 km |
Bonby Lane Anaerobic Digestion · Operational | 1.5 | 10.7 km |
Melton Ross Advanced Conversion Technologies · Operational | 5.8 | 10.8 km |
Singleton Birch (Farm AD) Anaerobic Digestion · Operational | 1.5 | 11.5 km |
Roxby Gas to Energy Landfill Gas · Operational | 8.5 | 13.4 km |
Bagmoor Wind Onshore · Operational | 16 | 14.1 km |
How big is Brigg Renewable Energy Plant?
Brigg Renewable Energy Plant has a recorded installed capacity of 40 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Brigg Renewable Energy Plant?
REPD records the operator as Eco2. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Brigg Renewable Energy Plant approved and built?
The application was submitted on 2009-03-23. Permission was granted on 2011-10-18, 31 months later. The site became operational on 2016-02-23, 52 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 150.
Novarly Parcel · official public data, read properly · parcel.novarly.com