Brigg Renewable Energy Plant is an operational 40 MW biomass plant in North Lincolnshire, generating since 23 February 2016. Planning permission was granted on 18 October 2011, 31 months after submission. Operator of record: Eco2.

40 MW
Capacity
as recorded in REPD
Operational
Status
since 23 February 2016
Biomass (dedicated)
Technology
Eco2
North Lincolnshire
Authority
England

Planning and build timeline

Application submitted23 March 2009
Permission granted18 October 2011
31 months after submission
Operational23 February 2016
52 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Lincolnshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Brigg Renewable Energy Plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.241.9 km
Solar Photovoltaics · Operational
385.2 km
Anaerobic Digestion · Operational
1.510.7 km
Advanced Conversion Technologies · Operational
5.810.8 km
Anaerobic Digestion · Operational
1.511.5 km
Landfill Gas · Operational
8.513.4 km
Wind Onshore · Operational
1614.1 km

How big is Brigg Renewable Energy Plant?

Brigg Renewable Energy Plant has a recorded installed capacity of 40 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Brigg Renewable Energy Plant?

REPD records the operator as Eco2. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Brigg Renewable Energy Plant approved and built?

The application was submitted on 23 March 2009. Permission was granted on 18 October 2011, 31 months later. The site became operational on 23 February 2016, 52 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 150.