Singleton Birch (Farm AD) is operational in North Lincolnshire with a recorded capacity of 1.5 MW, and has been generating since 2014-03-21.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-21
Anaerobic Digestion
Technology
Singleton Birch
North Lincolnshire
Authority
England

Planning and build timeline

Application submitted2012-12-12
Permission granted2013-03-11
3 months after submission
Operational2014-03-21
12 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Melton Ross
Advanced Conversion Technologies · Operational
5.80.7 km
Bonby Lane
Anaerobic Digestion · Operational
1.58.7 km
Atherton Way - Solar Panels
Solar Photovoltaics · Operational
0.2410 km
Brigg Renewable Energy Plant
Biomass (dedicated) · Operational
4011.5 km
Immingham
Landfill Gas · Operational
211.6 km
Immingham Landfill Scheme
Landfill Gas · Operational
111.6 km
Trondheim Way Battery energy storage
Battery · Under Construction
8011.8 km
Grimsby Solar Farm
Solar Photovoltaics · Under Construction
49.912.6 km

How big is Singleton Birch (Farm AD)?

Singleton Birch (Farm AD) has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Singleton Birch (Farm AD)?

REPD records the operator as Singleton Birch. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Singleton Birch (Farm AD) approved and built?

The application was submitted on 2012-12-12. Permission was granted on 2013-03-11, 3 months later. The site became operational on 2014-03-21, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 260.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council