Renewable sites › Atherton Way - Solar Panels
Atherton Way - Solar Panels
Atherton Way - Solar Panels is operational in North Lincolnshire with a recorded capacity of 0.24 MW, and has been generating since 2022-12-06.
Planning and build timeline
| Application submitted | 2022-04-28 |
| Permission granted | 2023-03-22 11 months after submission |
| Operational | 2022-12-06 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Lincolnshire’s record on solar
North Lincolnshire has decided 28 solar farms and approved 89%, taking a median of 1.8 months. See every solar farm decision in North Lincolnshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Brigg Renewable Energy Plant Biomass (dedicated) · Operational | 40 | 1.9 km |
Raventhorpe Farm Solar Photovoltaics · Operational | 38 | 5.5 km |
Bonby Lane Anaerobic Digestion · Operational | 1.5 | 8.8 km |
Melton Ross Advanced Conversion Technologies · Operational | 5.8 | 9.4 km |
Singleton Birch (Farm AD) Anaerobic Digestion · Operational | 1.5 | 10 km |
Roxby Gas to Energy Landfill Gas · Operational | 8.5 | 12.6 km |
Bagmoor Wind Onshore · Operational | 16 | 13.6 km |
Winterton Landfill Site Landfill Gas · Operational | 3.8 | 14.8 km |
How big is Atherton Way - Solar Panels?
Atherton Way - Solar Panels has a recorded installed capacity of 0.24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Atherton Way - Solar Panels?
REPD records the operator as Rocal Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Atherton Way - Solar Panels approved and built?
The application was submitted on 2022-04-28. Permission was granted on 2023-03-22, 11 months later. The site became operational on 2022-12-06.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11335.
Novarly Parcel · official public data, read properly · parcel.novarly.com