Renewable sites › Seghill Village Waste Disposal Site phase 1 and 2
Seghill Village Waste Disposal Site phase 1 and 2
Seghill Village Waste Disposal Site phase 1 and 2 is operational in Northumberland with a recorded capacity of 4.1 MW, and has been generating since 1998-02-19.
Planning and build timeline
| Application submitted | 1996-10-01 |
| Permission granted | 1996-12-13 2 months after submission |
| Operational | 1998-02-19 14 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Northumberland
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Tynemouth Energy Storage System (TESS) Battery · Operational | 25 | 4.5 km |
Cramlington CHP Biomass (dedicated) · Operational | 27.7 | 6.7 km |
MSD Cramlington Wind Onshore · Operational | 4 | 7.2 km |
Standby Embedded Stor Power Plant - Battery storage Battery · Under Construction | 20 | 7.4 km |
Blyth Harbour Wind Farm Wind Onshore · Operational | 2.7 | 7.5 km |
Blyth Harbour Wind Farm (re-power) Wind Onshore · Operational | 3.4 | 7.8 km |
Blyth Sewage Treatment Works Solar Photovoltaics · Operational | 2.3 | 7.8 km |
Brenkley Landfill Landfill Gas · Operational | 1.9 | 8.9 km |
How big is Seghill Village Waste Disposal Site phase 1 and 2?
Seghill Village Waste Disposal Site phase 1 and 2 has a recorded installed capacity of 4.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Seghill Village Waste Disposal Site phase 1 and 2?
REPD records the operator as Northumberland Waste Management / SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Seghill Village Waste Disposal Site phase 1 and 2 approved and built?
The application was submitted on 1996-10-01. Permission was granted on 1996-12-13, 2 months later. The site became operational on 1998-02-19, 14 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 567.