Novarly ParcelRenewable sites

Renewable sitesBlyth Offshore�Wind Test Site

Blyth Offshore�Wind Test Site

Blyth Offshore�Wind Test Site is operational in England with a recorded capacity of 41.5 MW, and has been generating since 2017-10-22.

41.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-10-22
Wind Offshore
Technology
EDF Energy Renewables
National
Authority
England

Planning and build timeline

Application submitted2012-03-01
Permission granted2013-11-08
20 months after submission
Operational2017-10-22
47 months after consent

Other built sites within 15 km

SiteMWDistance
Blyth Harbour Wind Farm
Wind Onshore · Operational
2.79.5 km
Blyth Harbour Wind Farm (re-power)
Wind Onshore · Operational
3.49.6 km
Lynemouth Power Station
Biomass (dedicated) · Operational
42011.6 km
Blyth Sewage Treatment Works
Solar Photovoltaics · Operational
2.311.8 km
Lynemouth Windfarm (Resubmission)
Wind Onshore · Operational
2611.8 km
Bewick Drift
Wind Onshore · Operational
2.313.4 km

How big is Blyth Offshore�Wind Test Site?

Blyth Offshore�Wind Test Site has a recorded installed capacity of 41.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Blyth Offshore�Wind Test Site?

REPD records the operator as EDF Energy Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Blyth Offshore�Wind Test Site approved and built?

The application was submitted on 2012-03-01. Permission was granted on 2013-11-08, 20 months later. The site became operational on 2017-10-22, 47 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2523.