Novarly ParcelRenewable sites

Renewable sitesSwindon Energy Plant (Park Grounds)

Swindon Energy Plant (Park Grounds)

Swindon Energy Plant (Park Grounds) is a 6 MW advanced conversion plant under construction in Wiltshire. Planning permission was granted on 15 June 2017, 2 months after submission. Operator of record: Advanced Biofuel Solutions (formerly Crapper and Sons Landfill).

6 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Advanced Conversion Technologies
Technology
Advanced Biofuel Solutions (formerly Crapper and Sons Landfill)
Wiltshire
Authority
England

Planning and build timeline

Application submitted7 April 2017
Permission granted15 June 2017
2 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Wiltshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Swindon Energy Plant (Park Grounds)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
123.3 km
Solar Photovoltaics · Operational
8.73.8 km
Solar Photovoltaics · Operational
54.2 km
Solar Photovoltaics · Operational
55.1 km
Solar Photovoltaics · Operational
86 km
Solar Photovoltaics · Operational
69.86 km
Battery · Operational
49.996.7 km
Battery · Operational
49.997.7 km

How big is Swindon Energy Plant (Park Grounds)?

Swindon Energy Plant (Park Grounds) has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Swindon Energy Plant (Park Grounds)?

REPD records the operator as Advanced Biofuel Solutions (formerly Crapper and Sons Landfill). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Swindon Energy Plant (Park Grounds) approved and built?

The application was submitted on 7 April 2017. Permission was granted on 15 June 2017, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6396.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode