Brindley Close (Extension)

Brindley Close (Extension) is under construction in Swindon with a recorded capacity of 6 MW.

6 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Public Power Solutions
Swindon
Authority
England

Planning and build timeline

Application submitted2020-07-13
Permission granted2020-09-04
2 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Swindon’s record on battery storage

Swindon has decided 6 battery storage schemes and approved 100%, taking a median of 6.2 months. See every battery storage scheme decision in Swindon

Other built sites within 15 km

SiteMWDistance
Barnfield Solar Park
Solar Photovoltaics · Operational
2.50.1 km
Swindon Sewerage Treatment Works
Anaerobic Digestion · Operational
1.20.8 km
Mannington Battery Storage Plant
Battery · Operational
49.92.3 km
Arkwright Road, Groundwell Industrial Estate - Solar Panels
Solar Photovoltaics · Under Construction
0.913.9 km
Chapel Farm
Solar Photovoltaics · Operational
54.3 km
Common Farm
Solar Photovoltaics · Operational
4.84.4 km
Chapel Farm Landfill
Landfill Gas · Operational
34.7 km
Wickfield Farm
Solar Photovoltaics · Operational
55.3 km

How big is Brindley Close (Extension)?

Brindley Close (Extension) has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Brindley Close (Extension)?

REPD records the operator as Public Power Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Brindley Close (Extension) approved and built?

The application was submitted on 2020-07-13. Permission was granted on 2020-09-04, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8045.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council