Renewable sites › Brindley Close (Extension)
Brindley Close (Extension)
Brindley Close (Extension) is under construction in Swindon with a recorded capacity of 6 MW.
Planning and build timeline
| Application submitted | 2020-07-13 |
| Permission granted | 2020-09-04 2 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Swindon’s record on battery storage
Swindon has decided 6 battery storage schemes and approved 100%, taking a median of 6.2 months. See every battery storage scheme decision in Swindon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Barnfield Solar Park Solar Photovoltaics · Operational | 2.5 | 0.1 km |
Swindon Sewerage Treatment Works Anaerobic Digestion · Operational | 1.2 | 0.8 km |
Mannington Battery Storage Plant Battery · Operational | 49.9 | 2.3 km |
Arkwright Road, Groundwell Industrial Estate - Solar Panels Solar Photovoltaics · Under Construction | 0.91 | 3.9 km |
Chapel Farm Solar Photovoltaics · Operational | 5 | 4.3 km |
Common Farm Solar Photovoltaics · Operational | 4.8 | 4.4 km |
Chapel Farm Landfill Landfill Gas · Operational | 3 | 4.7 km |
Wickfield Farm Solar Photovoltaics · Operational | 5 | 5.3 km |
How big is Brindley Close (Extension)?
Brindley Close (Extension) has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Brindley Close (Extension)?
REPD records the operator as Public Power Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Brindley Close (Extension) approved and built?
The application was submitted on 2020-07-13. Permission was granted on 2020-09-04, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8045.
Novarly Parcel · official public data, read properly · parcel.novarly.com