Solar planning in Babergh

Babergh has decided 6 solar farms and approved 67% of them, taking a median of 2.9 months to decide. Consented capacity: 4 MW.

67%
Approved
4 granted · 2 refused
2.9 mo
Median decision
UK 2.3 mo
4 MW
Consented
31 MW refused
2
Appeals
0 allowed on appeal

⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Babergh compares

Against the 298 UK authorities with 5+ solar decisions, Babergh sits in the 2nd percentile for approval rate (26 points below the England average) and the 36th percentile for speed.

Decisions by year

35Refused — 1 (2013)113Refused — 1 (2014)114Approved — 1 (2022)122Approved — 1 (2023)123Approved — 1 (2024)124
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (6)

SchemeMWStatusDecided
Ipswich High School, Main Road - Solar Panels
Ipswich High School For Girls · DC/24/02134 · 2.9 mo to decide
0.39Awaiting Construction2024-12-16
Brundon Lane - Solar Panels
ASR Limited · DC/23/02773 · 1.7 mo to decide
0.27Awaiting Construction2023-08-03
Northern Road, Chilton Industrial Estate - Solar Park
JCS Hi-Torque Limited · DC/22/02948 · 2.5 mo to decide
0.69Awaiting Construction2022-08-24
Rogers Farm
Sun & Soil · B/13/01107 · 5.3 mo to decide
15Appeal Refused2014-02-27
Valley Farm
Hive Energy · B/12/01279 · 3.7 mo to decide
16Appeal Refused2013-06-12
Babergh Home Solar Scheme
Babergh District Council
2.8Operational

Does Babergh approve solar farms?

Yes — of the 6 solar farms Babergh has decided, 67% were approved (4 granted, 2 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Babergh?

The median time from application to decision is 2.9 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Babergh consented?

4 MW has been consented across 4 approved schemes, with 31 MW refused. There are no applications currently awaiting a decision.

Other technologies in Babergh

Battery storage in BaberghOnshore wind in Babergh

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.