Sewage Treatment Works, Rosehall Road - Solar PV Panels

Sewage Treatment Works, Rosehall Road - Solar PV Panels is under construction in North Lanarkshire with a recorded capacity of 0.23 MW.

0.23 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Scottish Water
North Lanarkshire
Authority
Scotland

Planning and build timeline

Application submitted2022-11-21
Permission grantednot recorded
Operationalnot recorded

North Lanarkshire’s record on solar

North Lanarkshire has decided 14 solar farms and approved 100%, taking a median of 1.1 months. See every solar farm decision in North Lanarkshire

Other built sites within 15 km

SiteMWDistance
Brownhill Farm
Wind Onshore · Under Construction
8.43.6 km
West Benhar wind farm
Wind Onshore · Operational
27.23.8 km
Watsonhead Wind Farm
Wind Onshore · Operational
8.44.9 km
Auchinlea Landfill Site
Landfill Gas · Operational
2.35.6 km
Black Law Extension - 1a
Wind Onshore · Operational
48.46.6 km
Black Law Extension - 1b
Wind Onshore · Operational
156.6 km
Black Law
Wind Onshore · Operational
1246.6 km
Levenseat Waste Management Facility
Advanced Conversion Technologies · Operational
177.5 km

How big is Sewage Treatment Works, Rosehall Road - Solar PV Panels?

Sewage Treatment Works, Rosehall Road - Solar PV Panels has a recorded installed capacity of 0.23 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sewage Treatment Works, Rosehall Road - Solar PV Panels?

REPD records the operator as Scottish Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sewage Treatment Works, Rosehall Road - Solar PV Panels approved and built?

The application was submitted on 2022-11-21. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12922.