Brownhill Farm
Brownhill Farm is an 8.4 MW onshore wind farm under construction in North Lanarkshire. Planning permission was granted on 17 July 2020, 2 months after submission. Operator of record: Wind Estate.
Planning and build timeline
| Application submitted | 12 May 2020 |
| Permission granted | 17 July 2020 2 months after submission |
| Operational | not recorded |
Screening a site of your own?
North Lanarkshire approves 70% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Brownhill Farm’s recorded coordinate — swap in your own postcode or coordinates.
North Lanarkshire’s record on onshore wind
North Lanarkshire has decided 20 onshore wind schemes and approved 70%, taking a median of 16.8 months. See every onshore wind scheme decision in North Lanarkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 27.2 | 0.8 km |
Solar Photovoltaics · Under Construction | 0.23 | 3.6 km |
Wind Onshore · Operational | 9 | 4 km |
Wind Onshore · Operational | 5.7 | 4.5 km |
Wind Onshore · Operational | 1.5 | 4.5 km |
Advanced Conversion Technologies · Operational | 17 | 6.8 km |
Wind Onshore · Operational | 8.5 | 7.2 km |
Wind Onshore · Operational | 30.75 | 7.6 km |
How big is Brownhill Farm?
Brownhill Farm has a recorded installed capacity of 8.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Brownhill Farm?
REPD records the operator as Wind Estate. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Brownhill Farm approved and built?
The application was submitted on 12 May 2020. Permission was granted on 17 July 2020, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7991.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode