Renewable sites › Aborfield Solar Park
Aborfield Solar Park
Aborfield Solar Park is a 14 MW solar farm under construction in Wokingham. Planning permission was granted on 12 March 2021, 12 months after submission. Operator of record: Wessex Solar Energy.
Planning and build timeline
| Application submitted | 23 March 2020 |
| Permission granted | 12 March 2021 12 months after submission |
| Operational | not recorded |
Screening a site of your own?
Wokingham approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Aborfield Solar Park’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Wokingham’s record on solar
Wokingham has decided 12 solar farms and approved 100%, taking a median of 1.7 months. See every solar farm decision in Wokingham →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5 | 2.8 km |
Wind Onshore · Operational | 2 | 5.8 km |
Solar Photovoltaics · Under Construction | 17.87 | 7.1 km |
Solar Photovoltaics · Operational | 1.7 | 7.2 km |
Solar Photovoltaics · Operational | 15.8 | 7.4 km |
Battery · Under Construction | — | 9.9 km |
Solar Photovoltaics · Under Construction | 49.9 | 9.9 km |
Solar Photovoltaics · Operational | 5.9 | 11.2 km |
How big is Aborfield Solar Park?
Aborfield Solar Park has a recorded installed capacity of 14 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Aborfield Solar Park?
REPD records the operator as Wessex Solar Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Aborfield Solar Park approved and built?
The application was submitted on 23 March 2020. Permission was granted on 12 March 2021, 12 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5371.