Bunkers Hill Farm - Solar farm & Battery stations is under construction in Hart with a recorded capacity of 49.9 MW.

49.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Vantage RE
Hart
Authority
England

Planning and build timeline

Application submitted2021-02-25
Permission granted2021-11-11
9 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Hart’s record on solar

Hart has decided 8 solar farms and approved 88%, taking a median of 3.8 months. See every solar farm decision in Hart

Other built sites within 15 km

SiteMWDistance
Bunkers Hill Farm - Solar farm & Battery stations
Battery · Under Construction
0 km
Kiln Fields Solar Farm
Solar Photovoltaics · Under Construction
17.873.2 km
Taplins Farm solar park
Solar Photovoltaics · Operational
5.95.2 km
Basingstoke Sewage Treatment Works
Anaerobic Digestion · Operational
1.25.5 km
Hungerford Farm
Solar Photovoltaics · Operational
55.7 km
Chineham ERF
EfW Incineration · Operational
85.7 km
Minchens Lane Battery Storage Facility
Battery · Operational
1008.5 km
Aborfield Solar Park
Solar Photovoltaics · Under Construction
149.9 km

How big is Bunkers Hill Farm - Solar farm & Battery stations?

Bunkers Hill Farm - Solar farm & Battery stations has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bunkers Hill Farm - Solar farm & Battery stations?

REPD records the operator as Vantage RE. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bunkers Hill Farm - Solar farm & Battery stations approved and built?

The application was submitted on 2021-02-25. Permission was granted on 2021-11-11, 9 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8149.