Novarly ParcelRenewable sites

Renewable sitesKiln Fields Solar Farm

Kiln Fields Solar Farm

Kiln Fields Solar Farm is a 17.87 MW solar farm under construction in Hart. Planning permission was granted on 20 December 2021, 1 months after submission. Operator of record: Enviromena Asset Management UK Limited.

17.87 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Enviromena Asset Management UK Limited
Hart
Authority
England

Planning and build timeline

Application submitted10 November 2021
Permission granted20 December 2021
1 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Hart approves 88% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Kiln Fields Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Hart’s record on solar

Hart has decided 8 solar farms and approved 88%, taking a median of 3.8 months. See every solar farm decision in Hart

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
49.93.2 km
Battery · Under Construction
3.2 km
Anaerobic Digestion · Operational
1.26.4 km
EfW Incineration · Operational
86.6 km
Solar Photovoltaics · Operational
56.9 km
Solar Photovoltaics · Operational
5.97 km
Solar Photovoltaics · Under Construction
147.1 km
Battery · Operational
1007.3 km

How big is Kiln Fields Solar Farm?

Kiln Fields Solar Farm has a recorded installed capacity of 17.87 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kiln Fields Solar Farm?

REPD records the operator as Enviromena Asset Management UK Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kiln Fields Solar Farm approved and built?

The application was submitted on 10 November 2021. Permission was granted on 20 December 2021, 1 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9941.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode