Novarly ParcelRenewable sites

Renewable sitesKiln Fields Solar Farm

Kiln Fields Solar Farm

Kiln Fields Solar Farm is under construction in Hart with a recorded capacity of 17.87 MW.

17.87 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Enviromena Asset Management UK Limited
Hart
Authority
England

Planning and build timeline

Application submitted2021-11-10
Permission granted2021-12-20
1 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Hart’s record on solar

Hart has decided 8 solar farms and approved 88%, taking a median of 3.8 months. See every solar farm decision in Hart

Other built sites within 15 km

SiteMWDistance
Bunkers Hill Farm - Solar farm & Battery stations
Battery · Under Construction
3.2 km
Bunkers Hill Farm - Solar farm & Battery stations
Solar Photovoltaics · Under Construction
49.93.2 km
Basingstoke Sewage Treatment Works
Anaerobic Digestion · Operational
1.26.4 km
Chineham ERF
EfW Incineration · Operational
86.6 km
Sheepbridge Court Farm
Solar Photovoltaics · Operational
56.9 km
Taplins Farm solar park
Solar Photovoltaics · Operational
5.97 km
Aborfield Solar Park
Solar Photovoltaics · Under Construction
147.1 km
Minchens Lane Battery Storage Facility
Battery · Operational
1007.3 km

How big is Kiln Fields Solar Farm?

Kiln Fields Solar Farm has a recorded installed capacity of 17.87 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kiln Fields Solar Farm?

REPD records the operator as Enviromena Asset Management UK Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kiln Fields Solar Farm approved and built?

The application was submitted on 2021-11-10. Permission was granted on 2021-12-20, 1 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9941.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council