Renewable sites › Kiln Fields Solar Farm
Kiln Fields Solar Farm
Kiln Fields Solar Farm is under construction in Hart with a recorded capacity of 17.87 MW.
Planning and build timeline
| Application submitted | 2021-11-10 |
| Permission granted | 2021-12-20 1 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Hart’s record on solar
Hart has decided 8 solar farms and approved 88%, taking a median of 3.8 months. See every solar farm decision in Hart →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bunkers Hill Farm - Solar farm & Battery stations Battery · Under Construction | — | 3.2 km |
Bunkers Hill Farm - Solar farm & Battery stations Solar Photovoltaics · Under Construction | 49.9 | 3.2 km |
Basingstoke Sewage Treatment Works Anaerobic Digestion · Operational | 1.2 | 6.4 km |
Chineham ERF EfW Incineration · Operational | 8 | 6.6 km |
Sheepbridge Court Farm Solar Photovoltaics · Operational | 5 | 6.9 km |
Taplins Farm solar park Solar Photovoltaics · Operational | 5.9 | 7 km |
Aborfield Solar Park Solar Photovoltaics · Under Construction | 14 | 7.1 km |
Minchens Lane Battery Storage Facility Battery · Operational | 100 | 7.3 km |
How big is Kiln Fields Solar Farm?
Kiln Fields Solar Farm has a recorded installed capacity of 17.87 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Kiln Fields Solar Farm?
REPD records the operator as Enviromena Asset Management UK Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Kiln Fields Solar Farm approved and built?
The application was submitted on 2021-11-10. Permission was granted on 2021-12-20, 1 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9941.
Novarly Parcel · official public data, read properly · parcel.novarly.com