Renewable sitesBunkers Hill Farm - Solar farm & Battery stations

Bunkers Hill Farm - Solar farm & Battery stations

Bunkers Hill Farm - Solar farm & Battery stations is a battery storage site under construction in Hart. Planning permission was granted on 11 November 2021, 9 months after submission. Operator of record: Vantage RE.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Vantage RE
Hart
Authority
England

Planning and build timeline

Application submitted25 February 2021
Permission granted11 November 2021
9 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Hart approves 88% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bunkers Hill Farm - Solar farm & Battery stations’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Hart’s record on battery storage

Hart has decided 8 battery storage schemes and approved 88%, taking a median of 9.1 months. See every battery storage scheme decision in Hart

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
49.90 km
Solar Photovoltaics · Under Construction
17.873.2 km
Solar Photovoltaics · Operational
5.95.2 km
Anaerobic Digestion · Operational
1.25.5 km
Solar Photovoltaics · Operational
55.7 km
EfW Incineration · Operational
85.7 km
Battery · Operational
1008.5 km
Solar Photovoltaics · Under Construction
149.9 km

How big is Bunkers Hill Farm - Solar farm & Battery stations?

REPD does not record an installed capacity for Bunkers Hill Farm - Solar farm & Battery stations.

Who operates Bunkers Hill Farm - Solar farm & Battery stations?

REPD records the operator as Vantage RE. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bunkers Hill Farm - Solar farm & Battery stations approved and built?

The application was submitted on 25 February 2021. Permission was granted on 11 November 2021, 9 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8150.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode