Taplins Farm solar park

Taplins Farm solar park is operational in Hart with a recorded capacity of 5.9 MW, and has been generating since 2016-06-15.

5.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-06-15
Solar Photovoltaics
Technology
PS Renewables
Hart
Authority
England

Planning and build timeline

Application submitted2014-05-30
Permission granted2014-10-20
5 months after submission
Operational2016-06-15
20 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Hart’s record on solar

Hart has decided 8 solar farms and approved 88%, taking a median of 3.8 months. See every solar farm decision in Hart

Other built sites within 15 km

SiteMWDistance
Hungerford Farm
Solar Photovoltaics · Operational
51 km
Bunkers Hill Farm - Solar farm & Battery stations
Solar Photovoltaics · Under Construction
49.95.2 km
Bunkers Hill Farm - Solar farm & Battery stations
Battery · Under Construction
5.2 km
Kiln Fields Solar Farm
Solar Photovoltaics · Under Construction
17.877 km
Farnborough Airport - Solar Panels
Solar Photovoltaics · Operational
1.77.5 km
Farnborough International Exhibition Centre, Etps Road - Solar Panels
Solar Photovoltaics · Under Construction
1.158.8 km
Marsh House Solar Park
Solar Photovoltaics · Operational
5.59.5 km
Basingstoke Sewage Treatment Works
Anaerobic Digestion · Operational
1.210.5 km

How big is Taplins Farm solar park?

Taplins Farm solar park has a recorded installed capacity of 5.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Taplins Farm solar park?

REPD records the operator as PS Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Taplins Farm solar park approved and built?

The application was submitted on 2014-05-30. Permission was granted on 2014-10-20, 5 months later. The site became operational on 2016-06-15, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2312.