Renewable sites › Yelvertoft Wind Farm
Yelvertoft Wind Farm
Yelvertoft Wind Farm is an operational 16 MW onshore wind farm in West Northamptonshire, generating since 11 July 2013. Planning permission was granted on 20 July 2010, 14 months after submission. Operator of record: Greencoat UK Wind.
Planning and build timeline
| Application submitted | 15 May 2009 |
| Permission granted | 20 July 2010 14 months after submission |
| Operational | 11 July 2013 36 months after consent |
Screening a site of your own?
West Northamptonshire approves 67% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Yelvertoft Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
West Northamptonshire’s record on onshore wind
West Northamptonshire has decided 12 onshore wind schemes and approved 67%, taking a median of 17.6 months. See every onshore wind scheme decision in West Northamptonshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 49.9 | 2 km |
Wind Onshore · Operational | 10 | 2.4 km |
Wind Onshore · Operational | 4 | 2.8 km |
Solar Photovoltaics · Under Construction | 20 | 4.2 km |
Wind Onshore · Operational | 22 | 4.3 km |
Landfill Gas · Operational | 1 | 6.1 km |
Wind Onshore · Operational | 12.3 | 6.1 km |
Wind Onshore · Operational | 12.5 | 6.2 km |
How big is Yelvertoft Wind Farm?
Yelvertoft Wind Farm has a recorded installed capacity of 16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Yelvertoft Wind Farm?
REPD records the operator as Greencoat UK Wind. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Yelvertoft Wind Farm approved and built?
The application was submitted on 15 May 2009. Permission was granted on 20 July 2010, 14 months later. The site became operational on 11 July 2013, 36 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3978.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode