Renewable sites › Swinford Wind Farm
Swinford Wind Farm
Swinford Wind Farm is under construction in Harborough with a recorded capacity of 20 MW.
Planning and build timeline
| Application submitted | 2019-12-16 |
| Permission granted | 2021-12-22 24 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Conservation area — Swinford
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Harborough’s record on solar
Harborough has decided 12 solar farms and approved 100%, taking a median of 2.5 months. See every solar farm decision in Harborough →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Swinford Wind Farm Wind Onshore · Operational | 22 | 0.1 km |
Lilbourne Wind Farm Wind Onshore · Operational | 10 | 1.9 km |
Cotesbach Landfill Gas Project Landfill Gas · Operational | 2.3 | 3.3 km |
Northfield House Solar Farm Solar Photovoltaics · Operational | 26 | 4.1 km |
Yelvertoft Wind Farm Wind Onshore · Operational | 16 | 4.2 km |
Crick Road Solar Photovoltaics · Under Construction | 49.9 | 6.1 km |
Streetfield Farm Solar Photovoltaics · Operational | 18.3 | 6.9 km |
M1 J18 Wind Turbines Wind Onshore · Operational | 4 | 6.9 km |
How big is Swinford Wind Farm?
Swinford Wind Farm has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Swinford Wind Farm?
REPD records the operator as Vattenfall. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Swinford Wind Farm approved and built?
The application was submitted on 2019-12-16. Permission was granted on 2021-12-22, 24 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6720.