Crick Road

Crick Road is under construction in West Northamptonshire with a recorded capacity of 49.9 MW.

49.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Lightrock Power / Bluefield Solar Income Fund
West Northamptonshire
Authority
England

Planning and build timeline

Application submitted2020-04-08
Permission granted2020-11-19
7 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Northamptonshire’s record on solar

West Northamptonshire has decided 61 solar farms and approved 92%, taking a median of 2.9 months. See every solar farm decision in West Northamptonshire

Other built sites within 15 km

SiteMWDistance
M1 J18 Wind Turbines
Wind Onshore · Operational
41.9 km
Yelvertoft Wind Farm
Wind Onshore · Operational
162 km
Watford Lodge
Wind Onshore · Operational
12.54.2 km
Lilbourne Wind Farm
Wind Onshore · Operational
104.4 km
Kilsby Landfill Scheme
Landfill Gas · Operational
14.9 km
Winwick
Wind Onshore · Operational
12.35.1 km
Swinford Wind Farm
Solar Photovoltaics · Under Construction
206.1 km
Swinford Wind Farm
Wind Onshore · Operational
226.2 km

How big is Crick Road?

Crick Road has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Crick Road?

REPD records the operator as Lightrock Power / Bluefield Solar Income Fund. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Crick Road approved and built?

The application was submitted on 2020-04-08. Permission was granted on 2020-11-19, 7 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7954.